







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Chain Link Fence in Addison, TX: What It Costs and How Long It Takes
A Chain Link Fence in Addison, TX typically runs $3,500 – $9,000 for a residential or light commercial run, and most jobs are built in 3 – 5 working days once the permit clears. Here’s the short version: we walk the line, set the corners and terminal posts, pull the fabric tight, hang the gates, and you get a written warranty before we leave the property. Call (844) 560-0925 and we’ll get a free estimate on the calendar.

How We Build a Chain Link Fence Here, Stage by Stage

Chain link looks simple, and the cheap version is. The version that survives North Texas wind, hail, and clay soil is built in a specific order, and that order is why a fence that leans in year three usually shouldn’t have. Here’s exactly what happens when you hire us.
Stage 1: Walk the line and mark it
Day one is a full site walk. We lay out the fence line with you, mark corners and terminal points, confirm gate swings and heights, and check setbacks against your survey. You decide the height (4′, 5′, or 6′ are the common picks), gate count and swing direction, and whether you want any privacy slats or top rail upgrades. This is where you sign off on the layout, so nothing gets argued about later.
Stage 2: Call 811 and clear the path
Before a single post hole gets dug, we call 811 to have underground utilities located and marked. This is not optional and it’s not something you do yourself. We wait out the locate window, then clear the line of brush, old fencing, and anything else in the way. Demo of an existing fence usually takes half a day on a normal residential run.
Stage 3: Set posts and tie the framework
Holes go down 24 – 36 inches depending on post type and soil, then posts get set in concrete and plumbed. Corner, end, and gate posts take a heavier gauge and a bigger concrete collar because they carry the tension. This is one of the biggest quality tells: a builder who lightens up the terminal posts to save money is building a fence that will lean and sag within a couple of seasons. We don’t do that.
Stage 4: Stretch the fabric and hang the gates
Once the concrete sets, usually the next morning, we come back and pull the chain link fabric tight with a come-along, then secure it to the line posts and top rail. Gates get hung on their hinges and adjusted so they swing clean and latch every time. We set the tension bar, add the tension bands, and check the whole run for rattle and slack. Expect gates to be the fussy part of the day.
Stage 5: Final walk and a written warranty
We walk the whole line with you, open and close every gate, confirm the height and tension, and clean up the site. Then you get your documents: the workmanship warranty and a copy of the permit if one was pulled. That’s the whole job. Day one is layout and demo, day two is posts and concrete, and days three through five are fabric, gates, cleanup, and the walkthrough.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between
Chain link isn’t one product. It’s a family of choices, and the honest differences mostly come down to gauge, coating, and how heavy the frame is. Here’s what you’re actually picking between.
- Gauge (wire thickness): 11.5-gauge is the budget standard and fine for a backyard run. 9-gauge is heavier and more dent-resistant, which matters on a property line where dogs, kids, or ball-game traffic press against it. The heavier gauge costs more per linear foot, and it’s the right call if the fence takes a beating.
- Coating: Galvanized is the base and holds up reasonably in Texas heat. Vinyl-coated (usually black or green) adds a few dollars per foot but resists rust better and tones down the industrial look. On a residential lot backing a greenbelt or a neighbor’s yard, the coated version reads noticeably softer.
- Frame: Top rail and corner posts come in different weights. A 1⅝-inch rail on a standard run is normal. On long spans or high-wind-exposed lines, a heavier rail and a mid-rail on the fabric prevent the bellied look you see on cheap fences after a season of hard sun and wind.
- Height: 4-foot for a basic boundary, 5-foot for most residential privacy-by-security needs, 6-foot when you want it to read as a serious enclosure. Height adds cost, mostly in post gauge and weight of concrete required to hold the posts plumb.
- Gates: Single swing, double drive, and walk gates all mount on a heavier frame than line posts. A double drive gate is the big cost jump. Add a self-closing hinge or a latch upgrade if the gate is used daily.
- Privacy slats: Woven or inserted slats block sightlines and turn a chain link run into something closer to a screen. Going from none to a slat insert is a real line item, and you’ll want to decide it before the fabric gets ordered.
On brand, we don’t lean on a single manufacturer for chain link because the honest answer is that the frame and the installation matter more than the logo on the roll. We specify heavy-gauge galvanized or vinyl-coated fabric from national suppliers and we’re straightforward with you about which grade we’re quoting.
What Chain Link Fence Costs in Addison, TX
Most Chain Link Fence jobs in Addison land between $3,500 and $9,000. That range covers the material, labor, a standard residential run, a walk gate or two, and cleanup. A short boundary between two townhome lots sits at the low end. A long perimeter run with a double drive gate and privacy slats heads toward the top.

Four things move that number more than anything else:
- Linear footage and corners: Every corner and end point needs a heavier terminal post with more concrete. A straight run is cheaper per foot than a zigzag boundary. Gateway counts as high-cost linear footage because of the frame weight.
- Existing fence to remove: Demo and disposal is a real line item. A rusted old chain link is usually fast. A concrete-embedded or rooted-in-hedge fence is slower and priced accordingly.
- Soil and site access: If a truck can’t get close, the dig gets slower. Heavy clay that holds water can slow the concrete set and change the post depth required. Tight commercial-side lots in Addison have narrower access than suburban backyards.
- Coating, gauge, and gates: Vinyl-coated fabric and heavier gauge wire and rail push the number up. Each gate adds its own line, and a double drive gate is the biggest single add.
- Permit scope: If a permit is required, that’s a pulled permit and an inspection, priced into the estimate. HOA approval paperwork isn’t a permit but can hold up scheduling if you need it before work can start.
Your written estimate is line-item. You’ll see the linear footage quoted, the gauge and coating specified, the gate count, and demo broken out separately so you can see exactly what’s happening. What’s typically not included unless we note it: relocating utilities along the line, grading for drainage after fence removal, and any landscaping replacement. We’ll say so on the estimate rather than surprise you later. No-hassle upfront pricing is the whole point. Call (844) 560-0925 for a free estimate.
See the difference
Before
After
Before
After
Before
AfterWhat Addison Sites Specifically Do to This Job
Addison is a small, built-out commercial and restaurant hub, roughly four square miles inside ZIP 75001, surrounded by Dallas and Farmers Branch. Construction here is dominated by tenant improvements, restaurant and bar build-outs along the Belt Line Road and Dallas North Tollway corridors, and rebuilds of the 1970s – 80s low-rise office and multifamily stock. That shapes a chain link job more than you’d think. On a multifamily property near Belt Line, the fence line often runs along a service drive or dumpster enclosure where you’re working around trash pickup, deliveries, and late-night traffic. On a restaurant parcel, the fence may be the property-line screen behind a patio or the back-of-house enclosure, and the work sometimes has to be phased to keep the patio and neighboring tenants operating. The single-family pockets on the town’s edges are small and the lots are tight, so a residential run is usually a short side-yard or back property line rather than a half-acre perimeter. North Texas sun and heavy rain events also punish cheaper galvanized runs faster here than a builder might expect, so we quote the coating grade honestly rather than defaulting to the cheapest roll.
If you’re working on the wider property at the same time, a chain link run is often the first piece of a Fence Installation in Addison plan and the natural place to start. We cover the whole town through our Addison service area, and homeowners often pair a fence run with ADU Site Prep & Utilities in Addison when the line has to be moved or extended around a new structure. A gate that also needs new hardware is a small add-on, and if you’re replacing an entry, Door Installation in Addison is one we handle on the same visit when the scope lines up. You can also see the broader Fence Installation service if the project grows beyond a single chain link run.
Serving Addison, TX – Our Local Coverage Area
We serve Addison and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Chain Link Fence in Addison

Three to five working days for a standard residential run, once the permit clears and utilities are located. Layout and demo happen on day one, posts and concrete on day two, and fabric, gates, cleanup, and the final walk through the rest. Larger commercial runs or jobs with several gates take longer, and we’ll give you a real timeline in the estimate, not a guess.
It depends on the height and where the fence sits relative to the property line and any easements. We check the local requirement before we quote and we pull and schedule the permit when one is required, then handle the inspection. If an HOA also governs the lot, we’ll flag what they typically ask for. Call (844) 560-0925 and we’ll sort out the permit question before you commit to anything.
Yes, in most cases. We pull the line, keep the post holes tight, and haul off the construction debris. When an existing fence has to come out, we break down demo and disposal as its own line item so there are no surprises. Where there’s drip irrigation or a sprinkler line along the fence path, we mark it during the walk and route around it rather than through it.
Most jobs run $3,500 – $9,000, with the low end on a short boundary and the high end on a long perimeter with a double drive gate or privacy slats. Heavier gauge, vinyl coating, and existing fence demo push the number up. Call (844) 560-0925 for an exact quote. Estimates are free, and you get the full line-item breakdown in writing.
Every job is covered by our 730-Day Done Right Promise. If the fence isn’t built the way we said it would be, we make it right. Set posts, tightened fabric, and gates that latch clean are what we stand behind, and it’s in writing. We’ll walk the finished line with you before we close out, so you’re signing off on exactly what you paid for.
Get a Free Chain Link Fence Estimate in Addison
If a chain link run is on your list this year, call (844) 560-0925. You’ll reach a live person, day or night, and we’ll ask about the line, the footage, and the gate count, then schedule a free on-site walk. You get a written line-item estimate with no change-order surprises, backed by the 730-Day Done Right Promise. Plans over $10,000 qualify for $1,000 off, and 0% financing for 18 months is available. From foundation to finish line, we build it once and back it in writing.
Written by the team at Groundwork Construction Co.












