A Groundwork company - serving Carrollton, TX
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Addison, TX

New Detached ADU in Addison - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Carrollton
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Addison, TX: What It Costs and How Long It Takes

A new detached ADU in Addison, TX typically runs $45,000 to $130,000 and takes four to seven months from signed contract to move-in ready, with permitting and utility trenching usually the two slowest stretches. Detached means a freestanding structure with its own foundation, roof, meter or subpanel, and address – not a garage conversion or a bump-out. Call (844) 560-0925 for a free on-site estimate and a written, line-item quote before you commit to anything.

Two construction workers installing siding on a home addition project in Addison, TX

Call (844) 560-0925

How a Detached ADU Gets Built Here, Stage by Stage

A garage converted into a guest room and home office

Every detached unit follows the same skeleton. What changes is how long each stage takes in Addison’s tight, fully developed footprint. Here’s the real sequence, not a brochure summary.

Stage 1: Feasibility and setbacks (1 to 3 weeks)

Day one isn’t demolition – it’s measuring. We pull your plat, confirm where the buildable envelope actually sits on the lot, and find out how much of the yard the setbacks and any easements leave you. In Addison, where lots tend to be narrow and hemmed in by neighboring structures, this step often decides the whole design. By the end of week three you know the maximum footprint you can legally build and roughly where the utility runs enter.

Stage 2: Design, engineering, and permit submittal (4 to 8 weeks)

You approve a floor plan and exterior finish package, then a licensed engineer stamps the structural drawings. The permit package goes to the city, and this is where scheduling slides – review timelines move, and any comment that comes back adds days. This is the stage where you make the calls that matter most: unit size, one bedroom or a studio, full kitchen or kitchenette, and whether you want it wired for separate metering.

Stage 3: Site prep, foundation, and utility trenching (2 to 4 weeks)

We clear the footprint, excavate, and pour the slab or set pier-and-beam. Trenches get dug for water, sewer, and electrical in the same pass – relocating or extending any of these after the slab is poured is the single most expensive mistake in this trade. Your decision here is placement of the meter and subpanel, and it’s worth getting right the first time.

Stage 4: Framing, envelope, and rough-ins (5 to 9 weeks)

Walls go up, the roof gets dried in, and the windows and exterior doors get set. Rough electrical, plumbing, and HVAC run before the walls close, then the rough-in inspection happens. North Texas hail and summer heat both punish cheap envelopes, so this is where the material grade you pick in Stage 2 shows up in the schedule and the budget.

Stage 5: Finishes, final inspection, and punch list (4 to 8 weeks)

Insulation, drywall, cabinets, counters, flooring, fixtures, paint, and trim. Final inspection clears the unit, we walk it with you, and anything on the punch list gets fixed before we call it done. The whole build is covered by our 730-Day Done Right Promise – if it’s not done right, we make it right.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Decisions You’ll Actually Make

A detached ADU is a small house, which means every choice you’d make on a main home shows up here in miniature. These are the trade-offs worth thinking through before the drawings get stamped.

  • Slab vs. pier-and-beam foundation. Slab is cheaper and faster and suits Addison’s flat lots; pier-and-beam costs more up front but makes future plumbing access far easier. Most detached units here go slab.
  • Full kitchen vs. kitchenette. A full range, dishwasher, and vented hood add cost but widen who can live there. A kitchenette keeps the price down and suits a guest or studio tenant.
  • Separate meter vs. subpanel. A dedicated meter means the occupant pays their own utility bill and simplifies renting it out; a subpanel off the main house is less expensive and easier to permit.
  • Window package. North Texas sun and hail make this a real decision, not a cosmetic one. We work with ES Windows, ECO Window Systems, and Therma-Tru doors where the spec calls for them, and impact-rated glass earns its cost on west-facing walls.
  • Exterior finish. Brick or fiber cement hold up to hail and heat far better than vinyl; the trade-off is cost and install time.
  • HVAC. A dedicated mini-split is the usual pick for a detached unit – no duct run from the main house, and it zones cleanly.

What a New Detached ADU Costs in Addison, TX

Plan on $45,000 to $130,000 for a detached unit, with most Addison builds landing in the middle of that band. The low end is a compact studio on an easy lot; the high end is a full one-bedroom with a real kitchen, separate metering, and premium exterior finishes. Four things move the number most:

Two construction workers framing a wall for a home addition project in Addison, TX
  • Size and layout. Square footage drives foundation, framing, roof, and finish cost almost linearly. Every added bathroom or bedroom adds plumbing and electrical runs.
  • Utility distance. The farther the unit sits from the main house, the more trenching, pipe, and wire. A unit tucked close to the existing service is meaningfully cheaper.
  • Site conditions. Tight access, mature trees, or a lot that needs grading and drainage work push the price up before a single wall goes up.
  • Finish grade and systems. Builder-grade vs. upgraded cabinets, counters, flooring, and windows is often a $15,000 to $30,000 swing on its own.

A written estimate from us lists each line – foundation, framing, envelope, MEP rough-in, finishes, permits – so you can see exactly what’s included. What it typically won’t cover is landscaping restoration, fence work around the new structure, or furniture and appliances you supply yourself. Upfront pricing, no surprises: the number you see is the number you pay. Financing is available at 0% for 18 months, and projects over $10,000 get $1,000 off.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Addison’s Built Environment Does to This Job

Addison is roughly four square miles of commercial and restaurant density wrapped inside Dallas and Farmers Branch, and that shapes ADU work here in ways it doesn’t in the surrounding suburbs. Single-family pockets are small and mostly on the town’s edges, so a detached unit usually has to fit a narrow lot hemmed in by neighboring structures and mature trees – which makes the setback and access questions in Stage 1 the hardest part of the project. Permit review here is often a meeting-and-inspection process rather than a rubber stamp, and we build that review time into the schedule from day one.

The climate does its own work. North Texas heat, spring hail, and the occasional hard freeze push roof and envelope repairs on the surrounding low-rise buildings, and the same forces hit a new ADU – so we spec impact-rated glass and hail-resistant roofing from the start rather than retrofitting later. If your ADU sits near the Belt Line Road and Dallas North Tollway corridors, deliveries and concrete pours may need to avoid peak restaurant traffic and late-night hours, which is a scheduling reality unique to this town. Homeowners often pair an ADU build with Concrete Driveways & Concrete Work in Addison for the new parking approach, or Paver Driveways in Addison when they want the unit to match the main house’s hardscape. When the ADU is part of a full Home Additions & ADU in Addison plan, we scope both together so the site work runs once.

Serving Addison, TX – Our Local Coverage Area

We serve Addison and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked Questions About New Detached ADUs in Addison

A framer checking new wall framing on a home addition

Get a Free Estimate for Your New Detached ADU in Addison

Tell us about your lot and what you want the unit to do – guest space, rental income, or a place for family. We’ll come out, measure, talk through setbacks and utilities, and hand you a written line-item estimate at no cost. Call (844) 560-0925. A live person answers around the clock, and we’ll have your questions answered before you hang up.

Written by the team at Groundwork Construction Co.

Why Addison Chooses Groundwork Construction Co. of Carrollton

We set the standard for new detached ADU in Addison.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Addison

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Addison Customers Say

Trusted by homeowners across Addison and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new bay window with a cushioned seatA new wood side gate with black hardwareA new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityA wood double vanity with two mirrors after a bathroom remodel

More services in Addison

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Carrollton

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Carrollton team

A local vetted partner works across Carrollton and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Addison?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Addison.

(844) 560-0925

Request a Free Estimate in Addison

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch