







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Richardson, TX: What the Job Actually Involves
Cabinets & countertops in Richardson, TX typically run $14,000 – $45,000 for a full kitchen’s worth of new cabinetry and stone or quartz tops, and most projects take six to ten working days on site once materials land. That range covers the tear-out of old boxes, cabinet install, countertop template and set, and the sink and faucet reconnect. Call (844) 560-0925 for a free on-site estimate and a written line-item quote.

The Order of Work: How a Cabinet and Countertop Project Moves

Cabinets and countertops run in strict sequence, and the sequence is the reason the job takes days rather than hours. Here’s how we run it in Richardson, with the decisions you make at each stage.
Stage 1: Measure and final spec (1 – 2 hours, before any material is ordered)
We template the walls, check for out-of-square runs, and confirm appliance openings. You lock the cabinet door style, finish, and box construction here, plus the countertop material and edge profile. This is the decision-heavy day: once the order goes in, changes cost both money and weeks.
Stage 2: Tear-out and prep (1 – 2 days)
Old cabinets, countertops, and the existing sink come out. We cap plumbing, protect the floor, and repair drywall behind the boxes. On Richardson’s older ranch homes, this is where we find the surprises: water staining at the sink base, settling that threw a wall out of plumb, or old galvanized stubs that need swapping before the new cabinet goes flush.
Stage 3: Cabinet installation (2 – 3 days)
Base cabinets set first, leveled and shimmed to the actual floor plane, then uppers and any pantry runs. We fit filler strips and scribe molding to the walls so gaps read as intentional rather than sloppy. You confirm hardware placement and any pull-out or lazy-Susan additions before the doors go on.
Stage 4: Countertop template and fabrication (3 – 7 days of lead time)
Stone and quartz tops get templated after the cabinets are set, not before, because the template has to follow the installed boxes. Fabrication takes roughly a business week for most materials. You choose the sink and faucet now if you haven’t already, because the fabricator cuts the openings to those exact dimensions.
Stage 5: Countertop set and finish (1 day)
The tops arrive, get set and seamed, the sink and faucet connect, and we caulk and clean. Then the final walkthrough. Most Richardson jobs wrap within a two-week window from tear-out to usable kitchen, with the fabrication lead time as the biggest variable.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make: Cabinet and Countertop Options
- Cabinet box construction: Plywood boxes outlast particleboard in a humid Texas kitchen and hold screws at the hinges better over 20-plus years. They cost more up front. Particleboard is fine in a climate-controlled room if the budget is tight, but we don’t recommend it around a sink.
- Door material: Painted MDF is smooth and takes color well; solid wood and wood veneer read warmer and handle refinishing later. Thermofoil sheds moisture but can peel at the edges in a hot kitchen.
- Quartz vs. granite: Quartz is non-porous, uniform, and doesn’t need sealing, which suits a busy Richardson household. Granite is cheaper on some slabs and handles heat better, but it needs periodic sealing and every slab is a one-off.
- Edge profile: A simple eased or square edge keeps fabrication cost down. Bullnose and ogee profiles add labor to every linear foot.
- Sink and faucet: An undermount sink pairs cleanly with stone, and a solid-brass or ceramic-disc faucet (Grohe makes a strong one) outlasts a builder-grade unit by years.
What Cabinets & Countertops Cost in Richardson, TX
Most full kitchen cabinet and countertop packages in Richardson land between $14,000 and $45,000. The low end covers stock or semi-custom boxes with a laminate or entry-level quartz top; the high end is custom cabinetry with premium quartz and a large island run.

| Line item | Typical range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash (if included) | $800 – $2,500 |
| Island installation | $3,000 – $10,000 |
Five variables push a Richardson job toward the high end: the linear footage of cabinetry, whether you’re relocating plumbing or a gas line for a sink or range move, cabinet grade (stock, semi-custom, custom), the countertop material and edge, and whether the walls need repair or a wall gets opened. A written estimate from us lists each line item so the number you see is the number you pay. What it typically excludes: appliance cost, structural wall removal, and any electrical relocation you haven’t scoped in.
See the difference
Before
After
Before
After
Before
AfterWhat Richardson Homes Specifically Do to This Job
Richardson’s housing stock is the single biggest factor in how a cabinet and countertop project goes. The 75080 and 75081 ZIPs were built out largely in the 1950s through the 1970s around Collins Radio and Texas Instruments, so most of what we tear out is original postwar cabinetry on a 50-plus-year-old slab. That means out-of-square walls, settled floors, and occasionally galvanized or cast-iron plumbing behind the sink base that has to be addressed before new boxes go in. Homes east of Central Expressway around the Campbell Road corridor, in 75082, are newer 1980s – 2000s construction where the layout is more predictable but the cabinetry is reaching the end of its useful life. On lots that have already been through teardown-rebuild, we’re often fitting new cabinetry into a home built right beside an original 1960s ranch, which means checking the newer wall framing and confirming the kitchen layout against how the room was actually built. Because the region’s blackland clay keeps slabs moving, we check for level and account for it with shims and filler rather than assuming a flat floor.
Serving Richardson, TX – Our Local Coverage Area
We serve Richardson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Cabinets & Countertops in Richardson

Plan on six to ten working days on site, plus a fabrication lead time of roughly a week for stone or quartz. The cabinet install runs two to three days, the countertop template happens after that, and the fabrication turnaround is the wildcard. Call (844) 560-0925 and we’ll give you a schedule tied to your actual material selection.
Straight cabinet and countertop swaps that don’t move plumbing, gas, or electrical typically don’t require a permit. A permit is usually triggered when you relocate a sink, move a gas range line, or take out a wall. We pull permits where they’re required and pass inspection before the job closes. Call (844) 560-0925 to find out which category your project falls into.
Yes, and that’s the most common version of the job. Keeping the sink and range where they sit lets us swap cabinetry and tops without opening a wall. It’s when you want a sink under a window or a range moved across the room that plumbing, gas, and venting enter the scope. Call (844) 560-0925 for a straight answer on yours.
Most projects come in between $14,000 and $45,000. A smaller kitchen with stock cabinets and an entry-level quartz top sits near the bottom; custom millwork, a large island, and premium quartz push toward the top. The written estimate is line-itemed, so you can see exactly what each piece costs. Call (844) 560-0925 for a free on-site quote.
Every cabinet and countertop project is covered by our 730-Day Done Right Promise: if it isn’t done right, we make it right. That’s one of the longest workmanship guarantees in residential construction, and it applies to the install, the fit, and the finish. Call (844) 560-0925 to ask what it covers on your specific job.
Ready for a Free Cabinet and Countertop Estimate in Richardson?
We’ll come out, measure your kitchen, walk through the material options, and hand you a written line-item quote with no surprise change orders. Most Richardson kitchens can be quoted in a single visit. If you’re weighing this against a bigger scope, we also handle Kitchen Remodeling in Richardson and the broader Kitchen Remodeling service, and for homeowners planning a bigger structural change, Garage Conversion ADU in Richardson or a New Detached ADU in Richardson are often paired with a kitchen refresh. We cover Richardson and the surrounding area, including Plano, Garland, Murphy, and Sachse. Call (844) 560-0925 for your free estimate.
Written by the team at Groundwork Construction Co.












