A Groundwork company - serving Carrollton, TX
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Richardson, TX

New Detached ADU in Richardson - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Carrollton
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

What a New Detached ADU in Richardson, TX Actually Involves

A new detached ADU in Richardson, TX is a standalone, self-contained dwelling built on your existing lot, usually 500 to 1,000 square feet, and priced between $45,000 and $130,000 depending on size, utilities, and finish level. Most Richardson builds run six to nine months from signed contract to certificate of occupancy, and the largest chunk of that is permitting and inspection scheduling through the city. If you’re weighing a backyard cottage against other options, call (844) 560-0925 and we’ll walk you through scope, timeline, and a written range for your lot before you commit to anything.

Two construction workers installing siding on a home addition project in Richardson, TX

Call (844) 560-0925

How We Build a New Detached ADU in Richardson, Start to Finish

A remodeled family room with new windows and a window seat

This is not a garage conversion. A detached unit means a new footing, new walls, new roof, and a full utility run back to the main house, and the sequence matters because each stage locks in decisions for the next one.

Stage 1: Site walk and feasibility (week 1). Before any drawing exists, we measure the lot line, check setbacks, and look at what’s already buried. That means water and sewer taps, the electrical service location, and whether your existing panel can carry a second dwelling. On the older slab lots in 75080 and 75081, we’re often finding original cast-iron drain lines, and what we find here decides whether utilities route clean or get expensive. You decide the footprint and whether the unit is a one-bedroom studio or a two-bedroom.

Stage 2: Design and permitting (weeks 2 through 10). Drawings, engineering, and submittal to the city. Richardson reviews ADU plans for setbacks, height, lot coverage, and utility connections, and this is the stage with the widest swing because resubmittals eat weeks. You approve the final layout, the exterior finish, and the window and door package here.

Stage 3: Site prep and foundation (weeks 10 through 13). Trenching for utilities, grading, and the slab or pier system. On North Texas clay, foundation design is not a formality. We pour and cure, and you don’t have a decision to make here beyond approving the final utility trench route.

Stage 4: Framing, rough-in, and dry-in (weeks 13 through 20). Walls go up, the roof goes on, and plumbing, electrical, and HVAC rough-in get inspected before anything closes up. This is where your choices about mini-split versus ducted HVAC and tank versus tankless water heater get locked, and you’ll pick those at the start of this stage, not at the end.

Stage 5: Finishes and final inspection (weeks 20 through 34). Insulation, drywall, flooring, cabinets, fixtures, and the final code inspection before you get the certificate of occupancy. You’ll make your material selections in a single sitting early in this stage so nothing sits waiting.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between on a New Detached ADU

Every choice below moves the price and the long-term feel of the unit. Here’s the honest read on each.

  • Stick-built versus a panelized or prefab shell. Stick-built gives you an exact fit to the lot and any footprint you want. Panelized systems and prefab shells like Boxabl and Mighty Buildings speed up the shell stage and cut on-site labor, but they constrain dimensions and often push finish choices toward the manufacturer’s catalog.
  • Slab-on-grade versus pier-and-beam. Slab is cheaper and faster. Pier-and-beam handles the blackland clay movement better on some lots and gives you accessible plumbing, at a higher cost and a longer foundation stage.
  • Mini-split versus ducted HVAC. A single-zone mini-split typically costs less to install and run in a 600-square-foot unit. Ducted makes more sense once you’re above about 800 square feet or splitting the unit into two separate rooms.
  • Exterior cladding. Brick veneer matches the surrounding ranch housing and holds up against hail. Fiber cement is lighter and less expensive. Hardie board and similar systems are a common middle ground.
  • Windows and insulation package. Standard vinyl windows do the job. A higher-rated package costs more up front and pays back in a unit that sees full Texas summer sun. Given the 100°F stretches here, we usually steer people toward the better glass.
  • Utility strategy: separate meter versus tie-in. A separate meter costs more to establish but simplifies renting the unit later. Tying into the main house service is cheaper now and blurs the lines if you ever want to lease it out.

What a New Detached ADU Costs in Richardson, TX

Plan on $45,000 to $130,000 for the unit itself, with most Richardson builds landing in the middle of that band. The low end is a smaller footprint with a tie-in to existing utilities and standard finishes. The high end is a larger two-bedroom with a separate meter, upgraded glass, and full brick.

Five variables push a job toward one end or the other:

Two construction workers framing a wall for a home addition project in Richardson, TX
  • Size and footprint – square footage drives framing, foundation, roofing, and finish costs in a straight line.
  • Utility distance and condition – a long trench run back to the house, or a main panel that needs upgrading to carry a second dwelling, adds real money.
  • Lot conditions – clay movement, grading, and drainage corrections on an older subdivided lot can add site work that a newer greenfield lot wouldn’t need.
  • Finish grade – standard cabinets and vinyl flooring versus custom cabinetry and tile.
  • Permit and inspection scope – a straightforward plan approval versus one that needs resubmittal or engineering revisions.

A written estimate from us is line-itemed: foundation, framing, roofing, utilities, finishes, permits, and inspections, each with its own line. What sits outside the estimate are things nobody can price until they dig: an unexpected sewer condition, a panel that needs full replacement, or a grading fix the city flags mid-review. We tell you those are possible before we start, and we don’t spring them on you after. Call (844) 560-0925 for a free estimate and design consult.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Richardson Homes Specifically Do to a New Detached ADU

Richardson’s housing stock is unlike Plano or Frisco, and that shapes this job. The 75080 and 75081 ZIPs were built out largely in the 1950s through the 1970s around the Telecom Corridor and the Collins Radio and Texas Instruments era, so most lots we work are already fully built out, with a 1,400-square-foot brick ranch sitting on a slab that’s pushed against the setbacks for fifty years. You’re not starting from raw land. You’re fitting a second dwelling behind a house that was never planned for one.

That means survey and drainage issues come up routinely on lots subdivided decades ago, and the blackland clay under Richardson moves enough that foundation design for the new unit matters as much as it does for the main house. In 75082, east of Central Expressway around the Campbell Road corridor, the housing runs newer, and setbacks and utility routing tend to be more forgiving. Wherever the lot sits, the hail and spring storm pattern here drives us toward impact-rated roofing and a cladding choice that survives it. And because teardown-rebuilds have popped up beside original ranches all over the older core, new-build code compliance on an established street is a normal part of the review, not a surprise.

We cover all of Richardson and the surrounding ZIPs, and if the ADU is part of a full Home Additions & ADU in Richardson scope, we plan the whole site at once. You can see our broader Home Additions & ADU work and how we handle Richardson projects across the board. Homeowners often pair this with Concrete Driveways & Concrete Work in Richardson to give the unit its own parking pad, or Paver Driveways in Richardson where the front approach is being redone at the same time.

Serving Richardson, TX – Our Local Coverage Area

We serve Richardson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked Questions – New Detached ADU in Richardson

A framer checking new wall framing on a home addition

Get a Free Estimate for Your New Detached ADU in Richardson

Call (844) 560-0925 to schedule a free on-site estimate and design consult. A live person answers, day or night. On the call we’ll ask about your lot and what you want the unit for, then set a site visit where we measure setbacks, check the utility situation, and put a written range in your hands. No pressure, no vague bids. If the numbers work, we move to drawings.

Written by the team at Groundwork Construction Co.

Why Richardson Chooses Groundwork Construction Co. of Carrollton

We set the standard for new detached ADU in Richardson.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Richardson

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Richardson Customers Say

Trusted by homeowners across Richardson and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patioA new stained cedar privacy fenceA new paver patio with a seat wall and fire pitA remodeled primary bathroom with a soaking tub and walk-in showerA new clay tile roof

More services in Richardson

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Carrollton

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Carrollton team

A local vetted partner works across Carrollton and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Richardson?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Richardson.

(844) 560-0925

Request a Free Estimate in Richardson

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch