Cabinets & Countertops in Plano: What the Job Actually Involves
Cabinets & countertops in Plano typically run $14,000 – $45,000 for a full tear-out and replacement, and the work takes two to four weeks from demo to final caulk. Most of that time isn’t installation – it’s waiting on the countertop template and fabrication after the cabinets are set. For an exact number on your kitchen, call Groundwork Construction Co. at (844) 560-0925. Estimates are free and the quote is line-item, down to the pulls.

How We Run a Cabinet and Countertop Replacement, Stage by Stage

Five stages, in this order. The sequence matters more than most homeowners expect, because a rushed template is how you end up with a seam through the middle of your sink.
Stage 1: Template, measure, and the decisions you own (day 1)
We measure the room and confirm the layout before anything gets ordered. This is where you lock the door style, finish, cabinet box construction, and countertop material. You’ll also settle the sink and faucet now, not later – an undermount sink has to be on site before the countertop is fabricated, because the cutout gets built into the slab. Expect to spend an hour or two here. Bring the HOA packet if you have one; more on that below.
Stage 2: Demo and protection (days 2 – 3)
Old cabinets and counters come out, and we protect the floor, the range, and anything staying in the room. If you’re keeping the existing flooring under the toe kick, we cut carefully rather than pry. Water gets capped at the supply valves and the disposal and dishwasher get disconnected. Two days is typical for a standard Plano kitchen; a large island or a glued-down granite counter adds time.
Stage 3: Cabinet install (days 4 – 6)
Boxes go in first, then leveling and shimming – slab foundations move, and a cabinet run that isn’t shimmed flat will telegraph into the countertop. Doors and drawers go on last so they don’t get knocked around during the rest of the work. You’ll want to look at the reveal on the doors at this point; that’s the gap between door and frame, and it’s easier to adjust now than after the counter is set.
Stage 4: Countertop template and fabrication (days 7 – 17)
Once the base cabinets are in and level, we template the countertop with the actual sink and cooktop on hand. Natural stone and quartz then go to fabrication, which is where the calendar opens up. A simple laminate or butcher block counter can be cut and installed in a couple of days; quartz and granite typically take seven to ten business days from template to install, longer if you picked a slab your fabricator has to source.
Stage 5: Set, plumb, and punch list (days 18 – 21)
The counter goes on, the sink and faucet get set, and the dishwasher and disposal get reconnected. We check for level, seal the seams, and walk the room with you. Anything on the punch list – a door that rubs, a drawer that needs adjusting – gets handled before we call the job done, and it’s covered for two years under our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Actually Be Choosing Between
The choices below are the ones that move both the budget and how the kitchen feels five years from now. There’s no universally right answer, so treat the trade-offs as the honest part of the decision.
- Stock, semi-custom, or custom cabinet boxes. Stock cabinets are ready-made in fixed sizes and cost the least, but you fill odd gaps with filler strips. Semi-custom is the sweet spot for most Plano homes – standard sizes with adjustable depth and width. Custom gets you exact fits and unusual configurations, at a real premium. KraftMaid sits in the semi-custom range and is a solid fit for a 1980s or 1990s tract kitchen.
- Frame construction. Plywood boxes hold up much better than particleboard in North Texas humidity swings, especially around the dishwasher and sink. We’ll show you the difference in person.
- Door style and finish. Painted MDF doors are smooth and take color beautifully, but they chip at the edges and show greasy handprints near the range. Solid wood or wood-veneer doors tolerate wear better and can be refinished later. Thermofoil is the budget option – it’s durable until it isn’t, and it delaminates in heat.
- Countertop material. Quartz is the most common pick right now: non-porous, no sealing, consistent pattern. Granite costs about the same but needs periodic sealing and every slab is one of a kind. Laminate and butcher block come in well under the stone options if the budget needs to stretch to cabinets. Porcelain and solid surface sit in the middle.
- Edge profile and thickness. A standard eased edge is included; a thick built-up edge or a waterfall island end adds fabrication cost and weight.
- Sink and faucet. Undermount stainless and composite sinks are standard for stone counters, and a quality faucet (Grohe is a brand we trust for the hardware) is worth the upgrade – the cheap ones fail at the cartridge, not the finish.
What Cabinets & Countertops Cost in Plano, TX
A full cabinet and countertop replacement in Plano runs $14,000 – $45,000. A cabinet-only installation is $4,000 – $13,000; countertop installation alone is $2,000 – $6,500; a kitchen island is $3,000 – $10,000. Here’s where a job lands inside that range and why.
- Room size and cabinet run length. Linear feet is the single biggest lever. A 10-foot galley kitchen and a 25-foot kitchen with an island are two different budgets.
- Cabinet grade. Stock to custom is the widest spread of any single line in the estimate.
- Countertop material and slab selection. Quartz and granite in the mid range, laminate or butcher block well below it, and a rare or oversized slab pushes the top end.
- Relocation and structure. Moving a sink, range, or dishwasher means new plumbing and electrical rough-in, which adds a permit and a day or two. Taking out a wall is a separate question entirely.
- Existing condition. Soft subfloor, water damage around an old sink, or a slab that’s out of level all get addressed before new cabinets go in. Plano’s black-clay soils mean foundation movement shows up here more often than homeowners expect.
Your written estimate is line-itemed for cabinets, countertop fabrication, tear-out, install, plumbing and electrical reconnection, and disposal – so you can see exactly what each piece costs. What’s typically not included: appliance purchase (we install what you buy), structural changes, and HOA application fees. And the number in the estimate is the number you pay. No change orders for work that was on the original scope.

See the difference
Before
After
Before
After
Before
AfterWhat Plano Homes Specifically Do to This Job
Plano is largely built out. Most of the cabinet and counter work here is replacement inside 1970s – 1990s brick-veneer tract homes on slab foundations, not new construction – the older core around 75023 and 75074, the 1990s and 2000s builds in 75024 and 75093. That matters for one big reason: every one of these projects runs through two approval layers, Plano’s own permitting and inspection regime and the subdivision’s HOA architectural review. Neighboring cities don’t stack them the same way. Frisco is still building new, and Richardson, on the older side, has looser oversight.
What that means in practice is that if you’re changing the look of the kitchen – new door style, new finish, a different visual footprint – you may need HOA approval before work starts, and you’ll need it in writing before we order anything. Yes, we’ve seen a homeowner get a stop-work letter from the HOA because the cabinet color wasn’t on the approved list. Bring the packet, or tell us the subdivision; we’ll help you read the architectural review requirements and pull together the approval documentation, and we pull the permits. It’s the part of this job that has nothing to do with construction, and it’s the part that stops projects in Plano more often than the actual work does.
Serving Plano, TX – Our Local Coverage Area
We serve Plano and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Plano

Two to four weeks, with most of that being the wait on countertop fabrication. Cabinet install itself is about three days. Call (844) 560-0925 to get a schedule in writing, not a verbal guess.
Straight swap of cabinets and counters, same layout, usually doesn’t need one. Moving plumbing or electrical, or changing the wall or structure, does. We tell you which category your project is in before you sign anything, and we pull any permit that’s required.
Yes, and most jobs keep the sink, range, and dishwasher where they are. Keeping the plumbing in place saves roughly a day on the job and skips a permit. Moving them is possible; it’s a different scope and a different price.
The full job runs $14,000 – $45,000, with cabinets $4,000 – $13,000, countertops $2,000 – $6,500, and an island $3,000 – $10,000. Your exact number depends on room size, cabinet grade, and countertop material. Call (844) 560-0925 for a written line-item quote; the estimate is free.
Yes, for two years. The 730-Day Done Right Promise covers workmanship for two years, and if something isn’t right, we come back and fix it. A lot of Plano cabinet and counter jobs would run alongside a Garage Conversion ADU in Plano; ask us if you’re doing both, since the pricing and scheduling work better together.
Get a Free Cabinet and Countertop Estimate in Plano
Call Groundwork Construction Co. at (844) 560-0925 to schedule a free on-site estimate for cabinets & countertops in Plano. On the call we ask what your kitchen looks like now, what’s not working, and whether you’re working with a defined budget. Then we come out, measure, and put the line-item quote in your hands. From foundation to finish line, our team handles the work so you don’t have to manage multiple trades – and our technicians bring up to 12 years of experience to a cabinet or countertop job.
This combines naturally with a full Kitchen Remodeling in Plano if the scope grows, and if you’re weighing an addition, a New Detached ADU in Plano sometimes bundles in with the same cabinet package. But when the work is just cabinets and counters, that’s the whole job. For a look at how we run a renovation start to finish, see our Kitchen Remodeling page. We cover Plano and the surrounding North Texas communities – find your area on our Plano service page.
Written by the team at Groundwork Construction Co.