







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
ADU Design & Permitting in Garland, TX: What It Takes and What It Costs
ADU design and permitting in Garland runs $45,000 – $130,000 for a full accessory dwelling unit, though the design-and-permit portion alone is usually a smaller line item within that budget. Expect the design phase to take 4 – 8 weeks and the permitting phase another 6 – 12 weeks with Garland’s plan review and any platting or zoning questions. Call (844) 560-0925 to schedule a free on-site estimate.

How an ADU Gets Designed and Permitted Here, Step by Step
An ADU isn’t one job; it’s a stack of approvals that have to line up before anyone frames a wall. Here’s the sequence we run, with the decisions you own at each stage.
- 1
Stage 1 – Feasibility and site survey (week 1). We confirm your lot’s buildable area, setbacks, and utility access against Garland’s zoning for your parcel. On older Garland lots this is where we first check foundation condition, since the expansive clay here can force leveling before anything is permitted. You decide what the unit is for: rental, family, or aging-in-place.
- 2
Stage 2 – Schematic design (weeks 2 – 4). We lay out footprint, ceiling height, and rough openings so the unit reads as intentional, not tacked on. You pick door and window styles here; we often spec Therma-Tru entry doors for their weather sealing in North Texas heat, then finalize exterior finishes to match the main house.
- 3
Stage 3 – Construction drawings and engineering (weeks 4 – 8). Structural, MEP, and energy calcs get compiled into a permit-ready set. You review and approve the drawings before anything goes to the city; changes after this point mean resubmittal fees.
- 4
Stage 4 – Plan review and permitting (weeks 8 – 20). We submit to Garland and respond to reviewer comments, which on older platting often means clarifying setbacks or utility easements. You pay permit fees at this stage.
- 5
Stage 5 – Pre-construction handoff. Approved drawings, a fixed line-item price, and a build schedule. That last document is where the 730-Day Done Right Promise attaches to the workmanship.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between During Design
Most of the cost swing in an ADU comes from decisions made at the drafting table. Here’s where we ask you to choose, and what each choice does to the budget.
- Attached vs. detached. A garage conversion or attached unit shares a wall and utilities, so it’s cheaper to permit and build; a detached ADU is a separate structure with its own footprint, foundation, and service connections, which pushes toward the high end.
- New slab vs. tying into existing. A fresh slab-on-grade over prepared clay costs more up front than bolting onto a level existing foundation, but avoids settlement surprises down the road.
- Window and door package. Standard vinyl units keep costs down; upgraded systems like ES Windows or ECO Window Systems cost more but handle summer heat and hail better. We’ll walk you through the trade-off.
- Finishes. Builder-grade vs. mid-range finishes is the single biggest line you control. The unit is a few hundred square feet, so the finish delta is smaller in absolute dollars than in a full kitchen remodel.
- Utility routing. Keeping the unit’s plumbing and electrical close to the main house’s service saves real money compared to a detached unit with a long trench run.
What ADU Design & Permitting Costs in Garland, TX

A full ADU project in Garland typically lands between $45,000 and $130,000 when you include design, permitting, and construction. Design and drawing sets usually fall in the $3,000 – $9,000 range, and Garland’s permit fees scale with the scope of the work. The lead number for the whole project is what most homeowners need before they call, so here are the variables that move it:
- Unit size and footprint. A compact studio sits near the low end; a full one-bedroom pushes higher.
- Foundation. If the existing slab or pier-and-beam needs leveling before we build, that’s an add-on.
- Utility distance. A remote location means longer trenching and more material.
- Material grade. Windows, exterior cladding, and interior finishes each have tiers.
- Permit complexity. Older Garland platting can require clarification that adds review time and, occasionally, revised drawings.
Every written estimate we hand you splits into line items so you see what design, permits, and construction actually cost. We don’t come back with change orders because we missed something in the drawings.
See the difference
Before
After
Before
After
Before
AfterWhat Garland’s Housing Stock Means for This Job
Garland went up almost entirely in a single 1950s – 70s build-out, which means the lots you’re adding to have already been platted and built over, and the city’s review process is set up to handle exactly that: lots in ZIP codes 75040, 75041, 75042, and 75049 that need a new structure squeezed onto an existing lot. That’s different from the greenfield suburbs farther out. The practical effect is that on the older slab-on-grade ranches around downtown Garland and along the Forest Lane corridor, the first item on the checklist is often foundation condition; the black-clay soils that swell and shrink with North Texas wet-dry cycles can force leveling before an ADU can be permitted. We see the same on pier-and-beam homes whose piers have settled unevenly. On lots where the main house sits close to a rear or side setback, we work with you to fit the unit within Garland’s limits rather than asking for a variance. Homeowners planning a larger whole-property change often pair this with our Home Additions & ADU in Garland scope, and some add rear access or a Paver Driveways in Garland run to reach the new unit.

Serving Garland, TX – Our Local Coverage Area
We serve Garland and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions About ADU Design & Permitting in Garland

Plan on 3 – 5 months from first sketch to permit in hand, depending on plan review turnaround. Design runs 4 – 8 weeks and Garland’s review adds several more weeks. Call (844) 560-0925 for a timeline specific to your lot.
Yes, an ADU requires a permit in Garland, and you’ll need a stamp-ready drawing set and any zoning approvals before you build. We handle the drafting and submission so you’re not chasing the city yourself.
Often, yes. Keeping the unit’s plumbing and electrical close to your main house’s service saves real money. We look at utility routing during feasibility, before we commit to a footprint.
A complete ADU in Garland runs $45,000 – $130,000, with design-and-permit line items typically in the $3,000 – $9,000 range. Size, foundation condition, and finish grade move the number. Call (844) 560-0925 for an exact quote; estimates are free.
Everything we build is covered by our 730-Day Done Right Promise. If it’s not done right, we make it right, and the guarantee is in writing before the first trade shows up.
Ready to Price Your ADU in Garland?
Call (844) 560-0925 to schedule a free on-site estimate for ADU design and permitting in Garland. We’ll walk the lot, check your buildable area and foundation, and hand you a written line-item proposal you can actually read. If you want to see the wider project scope first, start with our Home Additions & ADU service page, then call so we can talk through what Garland zoning allows on your lot. Calls are answered by a live person around the clock.
Written by the team at Groundwork Construction Co.












