A Groundwork company - serving Carrollton, TX
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Highland Park, TX

Garage Conversion ADU in Highland Park - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Carrollton
A single-story rear room addition with tall windows and a new patio
A second-story addition that matches the existing roofline
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Highland Park: Costs, Codes, and What to Expect

A Garage Conversion ADU in Highland Park typically runs $45,000 – $130,000 and takes 4 – 7 months from the first site survey to final inspection. The job means turning an existing attached or detached garage into a legal, livable accessory dwelling: new slab or floor system, insulation and climate control, a bathroom and kitchenette, upgraded electrical, and the town’s own design review sign-off before anyone touches a wall. Call (844) 560-0925 and we’ll walk you through what your specific garage can realistically become.

How Our Garage Conversion ADU Process Actually Runs

Garage conversions look simple on paper. In practice, the sequence matters more than the speed, especially inside Highland Park’s review cycle, where a re-survey can reset your schedule. Here’s how we run it.

Two construction workers installing siding on a home addition project in Highland Park, TX

Stage 1: Survey and design, roughly weeks 1 – 4

We start by pulling the garage’s actual dimensions against the plat and confirming setback and lot-coverage numbers with the Town of Highland Park. At this stage you decide the layout: studio versus one-bedroom, where the bathroom sits, and whether you want a separate exterior entrance. Because the town administers its own design review, we build the drawing set to its architectural expectations from the first sketch, not after a rejection.

Stage 2: Permit submittal, weeks 4 – 8

We submit to Highland Park’s municipal plan review, which is separate from Dallas even though the town sits entirely inside it. You’ll usually have to sign off on the final drawing set here. This is the window where a re-survey or a tree-preservation review can add two to three weeks, so we never promise a hard ground-break date. It’s also where the size of your conversion gets locked in for good.

Stage 3: Demo and shell work, weeks 8 – 14

Day one on site is demo: pulling the old garage door, clearing the slab, and stripping anything that won’t carry the new floor load. Then the structural work begins. Most Highland Park garages are older detached structures with pier-and-beam or slab foundations, and if yours needs leveling or a new floor system, that decision point is yours to approve before we pour. Framing, roof tie-in, and the new exterior door and windows follow.

Stage 4: Systems rough-in, weeks 14 – 20

Electrical, plumbing, and HVAC go in and get inspected before a single wall closes. You’ll choose fixtures around this point, and that’s where a Kohler or Grohe fixture package versus a builder-grade line shows up in both the budget and the final feel of the bathroom and kitchenette.

Stage 5: Finishes and final inspection, weeks 20 – 28

Insulation, drywall, flooring, paint, cabinets, trim, and the final walkthrough. The town inspects, we correct anything flagged, and you get the certificate of occupancy. When you’re planning a bigger scope than the garage alone, this is often where people ask us to fold in part of a full Home Additions & ADU in Highland Park plan.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Make Between (and the Honest Trade-offs)

Most of the decisions that shape a Highland Park garage conversion come down to a handful of either-or calls. Here’s what we actually put in front of homeowners.

  • Floor system: a new poured slab is the budget option and the fastest to finish, but it can’t flex with North Texas clay movement the way a raised floor can. A raised wood floor costs more and takes longer but handles the expansive soil better and gives you room for plumbing underneath.
  • Climate control: a ductless mini-split is efficient and easy to retrofit into an existing shell; a full ducted system integrated with the house is a bigger spend but keeps the whole property on one thermostat. Ask what your garage’s insulation can support before you pick.
  • Bathroom and kitchenette grade: builder fixtures keep the number low; a Kohler or Grohe package adds finish and lifespan. For a rental or in-law suite used daily, the better-grade fixtures tend to earn their keep.
  • Roofing tie-in: if the garage roof is at the end of its life, a GAF or CertainTeed replacement is a natural add. Doing the roof during the conversion beats doing it two years later.
  • Exterior door and window style. This is where design review lives. Stock styles clear faster; a custom door that matches the main house can trigger more back-and-forth with the town.

What a Garage Conversion ADU Costs in Highland Park, TX

A remodeled family room with new windows and a window seat

As a line-item range for this town, the finished conversion lands between $45,000 and $130,000. That spread is wide because the variables below genuinely move the number by tens of thousands, and we quote them as separate lines so you can see where your money goes.

Line item Typical range
Structural & foundation work $6,000 – $22,000
Shell, roofing, doors, windows $8,000 – $25,000
Electrical, plumbing, HVAC $9,000 – $28,000
Bathroom & kitchenette finishes $8,000 – $24,000
Insulation, drywall, flooring, paint $7,000 – $20,000
Permits & design review $3,000 – $9,000

What pushes you to the high end: a detached garage that needs a new foundation, moving a kitchenette to a wall with no plumbing, a ducted HVAC system, and a custom door that design review scrutinizes. The low end is an attached garage on a sound slab with a studio layout and builder-grade finishes. Every written estimate we hand over is line-item and fixed upfront; the number you see is the number you pay. What’s typically not in the conversion quote: landscaping repair around the footprint, and a full roof replacement if the garage roof was already failing. We flag those separately so nothing surprises you mid-job.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Highland Park Specifically Does to This Job

The single biggest difference here is that Highland Park runs its own municipal plan review, zoning, and permitting instead of following Dallas codes. The town is completely surrounded by Dallas but administers its own inspections, lot-coverage limits, and design review. So even a garage conversion gets held to Highland Park’s stricter setback, height, and floor-area rules before a shovel hits ground, and architectural expectations get reviewed as part of that. Nearly every conversion we plan in 75205 starts with us reading the town’s coverage and impervious-cover numbers against your lot, because a re-survey that changes those numbers can force a redesign mid-project.

Two construction workers framing a wall for a home addition project in Highland Park, TX

The housing stock makes it trickier still. This is a small, fully built-out enclave where virtually everything is a remodel, an addition, or a teardown-rebuild, and a lot of the homes date to the 1910s – 1930s Tudor, Colonial, and Mediterranean era. That means century-old pier-and-beam structures that shift with North Texas’s expansive clay, so leveling and floor-system decisions come up on most conversions. Add the hail and summer heat and you’re scheduling exterior work around spring storm season. On alley-accessed lots off Beverly and Armstrong, there’s almost no room for material staging, so deliveries and sequencing get planned as tightly as the build. We handle every job across Highland Park with the same care.

Serving Highland Park, TX – Our Local Coverage Area

We serve Highland Park and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked: Garage Conversion ADU in Highland Park

A framer checking new wall framing on a home addition

Get a Free On-Site Estimate for Your Highland Park Garage Conversion

We’ll come out, measure the garage against your lot’s coverage and setback numbers, and talk through what the town will and won’t approve before you spend a dollar. You get a line-item estimate, a realistic schedule, and straight answers on the foundation and systems. Financing at 0% for 18 months and $1,000 off projects over $10,000 are available. Call (844) 560-0925 for your free estimate. A live person answers, 24/7.

Written by the team at Groundwork Construction Co.

Why Highland Park Chooses Groundwork Construction Co. of Carrollton

We set the standard for garage conversion ADU in Highland Park.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Highland Park

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Highland Park Customers Say

Trusted by homeowners across Highland Park and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
An open kitchen and dining area after a remodelA freestanding soaking tub in a remodeled primary bathroomA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new wood side gate with black hardwareA stone counter, tile backsplash and open shelf after a kitchen remodel

More services in Highland Park

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Carrollton

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Carrollton team

A local vetted partner works across Carrollton and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Highland Park?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Highland Park.

(844) 560-0925

Request a Free Estimate in Highland Park

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch