A Groundwork company - serving Carrollton, TX
A new rear addition with a vaulted beamed ceiling and tall windows
New Detached ADU · Farmers Branch, TX

New Detached ADU in Farmers Branch - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Carrollton
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
A new wood side gate with black hardware
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

New Detached ADU in Farmers Branch: What It Costs and How Long It Takes

A new detached ADU in Farmers Branch typically runs $45,000 – $130,000 and takes about five to seven months from signed contract to final inspection, depending on size, site work, and how deep the utility run has to go. The ADU Construction range for a fully appointed unit climbs into the $90,000 – $220,000 band; this page covers the smaller, simpler detached builds that fit a Farmers Branch backyard. Call (844) 560-0925 to get a free on-site estimate and a written line-item scope before anything is ordered.

Two construction workers installing siding on a home addition project in Farmers Branch, TX

Call (844) 560-0925

How a Detached ADU Gets Built Here, Stage by Stage

This isn’t a garage conversion where the box already exists. You’re putting a new structure in a backyard, so the sequence matters and each stage unlocks the next.

  • Days 1 – 3: site visit, survey, and scope lock. We walk the yard, check setbacks and utility locations, and confirm the footprint. You decide the unit size and whether it’s a studio-plus-alcove or a true one-bedroom. In Farmers Branch, lot lines are close, so where the ADU sits is often the first decision, not the last.
  • Weeks 1 – 4: design, engineering, and permits. Plans get drawn, a foundation engineer signs off on the slab, and the package goes to the City of Farmers Branch for plan review. Expect a few rounds of comments. You approve fixture and finish selections here because they affect plumbing rough-in.
  • Weeks 5 – 7: site prep, driveway and utility trenching. Alley access and tight-lot staging get worked out with neighbors in mind. Water, sewer, and electric get trenched from the main house or the alley. Homeowners often pair this with a new Concrete Driveways & Concrete Work in Farmers Branch so there’s a clean approach to the unit rather than a muddy path.
  • Weeks 8 – 18: foundation, framing, roof, and rough-ins. Slab pour, framing, sheathing, roofing (we use GAF or CertainTeed systems on the ADU roof), then electrical, plumbing, and HVAC rough-in. Each group gets inspected before the walls close. This is the longest stretch and where weather and material lead times bite.
  • Weeks 19 – 26: insulation, drywall, finishes, final inspection. Insulation, drywall, paint, flooring, cabinets, fixtures, and the final mechanical and building inspections. You do a walkthrough, punch list gets cleared, and we hand over keys under the 730-Day Done Right Promise.
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make

Most of the price swing comes from these decisions. Here’s the honest trade-off on each.

  • Footprint and unit type. A studio at 400 – 500 sq ft is the leanest build. A one-bedroom at 600 – 750 sq ft adds a wall, a door, and a second window but gives you real rental or family flexibility. Two bedrooms push you toward the top of the range.
  • Foundation and slab vs. pier-and-beam. North Texas black-clay soil moves, so we almost always recommend an engineered post-tension slab with proper drainage. It costs more up front but avoids the pier-and-beam callbacks this soil tends to trigger.
  • Roofing and exterior. Architectural shingles from GAF or CertainTeed are the sensible default in hail country. Metal costs more and holds up well but rarely pays back on a small ADU. James Hardie siding or a brick veneer to match the main house are both reasonable.
  • Plumbing fixtures. Builder-grade vs. a step up to a Grohe shower valve and trim is a small line item with an outsized feel in a compact unit. Kitchenette vs. full kitchen is the bigger call.
  • Utilities: tie-in vs. separate meter. Tying the ADU into the main house panel is cheaper if capacity allows. A separate meter adds cost but makes future rental accounting cleaner.

What a New Detached ADU Costs in Farmers Branch, TX

A finished backyard cottage with a small covered porch

Plan on $45,000 – $130,000 for a detached ADU here, with a fully finished larger unit reaching into the $90,000 – $220,000 ADU Construction band. The spread is wide because several things push the number:

  • Size and configuration. Every 100 sq ft adds framing, drywall, flooring, and fixtures across the board.
  • Site and utility distance. The farther the ADU sits from the main service connection, the more trenching, conduit, and pipe you pay for.
  • Slab and drainage conditions. Clay soil, mature trees, and old slab remnants from a prior structure can add excavation and grade work.
  • Finish grade. Builder-grade vs. custom cabinets and flooring moves the total by tens of thousands on a full unit.
  • Permit scope. A straightforward plan review costs less than one that needs variances or re-engineering mid-stream.

Our written estimate is line-item: foundation, framing, roofing, MEP, finishes, permits, and inspections each carry a number, and the number you see is the number you pay. No-hassle upfront pricing with no change orders for anything scoped. Not included: landscaping beyond grading, furniture, and appliances unless you specify them. If this is part of a larger plan, it’s often attached to a full Home Additions & ADU in Farmers Branch project so the design and permits move together.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Farmers Branch Homes Specifically Do to This Job

Farmers Branch is essentially built out, so a detached ADU here is almost never a greenfield build. It’s an infill job on a modest lot in a 1950s – 60s ranch subdivision in ZIP 75234, which changes everything. We routinely work narrow lots where the original one-story ranch is being expanded or replaced and the neighbors on both sides are living beside an active site. That means tight-lot staging, alley access coordination, and tree protection, none of which a new-suburb builder ever deals with. Add the North Texas black-clay soil and you get engineered slabs and drainage correction as a baseline rather than an upgrade. The City of Farmers Branch permitting and inspection process is thorough and homeowners here expect it handled precisely, which we build into the schedule. When a backyard build calls for a proper approach, some owners pair it with a new Paver Driveways in Farmers Branch to finish the yard off. We cover the whole of Farmers Branch and the surrounding area, and the detached ADU process here is genuinely different from building on a half-acre lot out in the country.

Two construction workers framing a wall for a home addition project in Farmers Branch, TX

Serving Farmers Branch, TX – Our Local Coverage Area

We serve Farmers Branch and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – New Detached ADU in Farmers Branch

A framer checking new wall framing on a home addition

Get a Free Estimate for Your New Detached ADU in Farmers Branch

A detached ADU is a real construction project, and the right next step is a free on-site estimate. Call (844) 560-0925 and a live person picks up around the clock. We’ll walk your lot, confirm setbacks and utility locations, and put a written line-item scope in your hands so you can price the job with confidence. You can also review our Home Additions & ADU service while you plan. Estimates are free and there’s no pressure to sign.

Written by the team at Groundwork Construction Co.

Why Farmers Branch Chooses Groundwork Construction Co. of Carrollton

We set the standard for new detached ADU in Farmers Branch.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Farmers Branch

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Farmers Branch Customers Say

Trusted by homeowners across Farmers Branch and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valleyA new casement window over a kitchen sinkA new white vinyl privacy fence with a double gateNew painted shaker cabinets with an organized deep drawer

More services in Farmers Branch

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Carrollton

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Carrollton team

A local vetted partner works across Carrollton and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for New Detached ADU in Farmers Branch?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Farmers Branch.

(844) 560-0925

Request a Free Estimate in Farmers Branch

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch