Cabinets & Countertops in Allen, TX: What the Job Actually Involves
Cabinets & countertops in Allen, TX typically run $14,000 – $45,000 for a full kitchen’s worth of new cabinetry and stone, and most projects take three to five weeks from demo to final walkthrough. The timeline hinges on cabinet lead time, not labor: stock lines land in days, semicustom in two to four weeks, and a countertop template can’t happen until the boxes are hung and leveled. Call (844) 560-0925 and we’ll talk through your kitchen, your budget, and what’s realistic before anyone touches a cabinet door.

Here’s the part most Allen homeowners don’t hear up front. Cabinets and counters are one job with two halves that refuse to overlap. The counter can’t be measured until the cabinets are set and shimmed. The counter can’t be installed until it’s fabricated. Get the sequence wrong and you’re eating weeks of dead time with a kitchen full of cardboard boxes.
How We Run a Cabinet and Countertop Job in Allen

Day one: tear-out and protect. We pull the old doors, drawers, boxes and counter, shut off and cap the water lines to the sink, and protect the floors and adjacent rooms. This is a one-to-two-day stage on a typical Allen kitchen. Before demo, you’ve already locked in your cabinet line, door style, finish and counter material. That decision drives everything downstream, so it’s made first, not last.
Days two through four: prep and rough-in. This is where the walls tell you what they’ve been hiding. On Allen’s 1990s and 2000s slab homes, we regularly find out-of-square walls behind the old cabinets and a lazy Susan cutout that no new box lines up with. We true up the walls, patch and prime, and handle any electrical or plumbing moves you approved. If you’re adding a dishwasher circuit or relocating the sink, it happens now, not after the stone goes in.
Days five through seven: cabinet install. Base boxes first, then uppers, then leveling and shimming. A cabinet run out of level by a quarter inch shows up as a two-inch gap at the counter seam, so we don’t rush this. You decide at this stage on filler strips, crown, and any end panels that finish the exposed sides.
Week two: template, then fabrication. Once the base cabinets are set, the countertop fabricator templates the actual run. That template is a physical record of your kitchen, and nothing gets cut until it’s signed off. Fabrication runs five to ten business days for most quartz and granite. You’re without a working sink for part of this window, and we plan around it.
Install and punch list. Stone goes in, sink and faucet set, and the final walk happens with you in the room. We check every door and drawer, every seam, and every caulk line before we call it done. Cabinets and counters are covered under our 730-Day Done Right Promise, so if a door sags or a seam opens in the first two years, we come back and make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Actually Make
The cabinet and counter decisions carry the most weight, and they’re the ones homeowners second-guess longest. Here’s the honest trade-off on each.
- Stock vs. semicustom cabinets. Stock lines are the fastest and cheapest route, but they come in fixed sizes, so you’re designing around the box. Semicustom lets you hit the wall exactly and pick interior fittings. KraftMaid’s semicustom line is what most Allen homeowners land on when the kitchen has an odd corner or a soffit to work around.
- Quartz vs. granite. Quartz is engineered, non-porous, and doesn’t need sealing, which suits a busy Allen household with kids. Granite is natural, harder to chip, and every slab is one of a kind, but it takes a reseal every year or two. Cambria quartz is a common pick for the clean, consistent look.
- Door construction and finish. Painted MDF doors look great and cost less, but they show wear faster in a heavy-use kitchen. Solid wood and plywood boxes hold up longer and take a refinish down the road.
- Counter thickness and edge profile. A 2cm or 3cm slab changes the price, and so does the edge. A basic eased edge is included; a mitered or double-thick edge adds labor and material.
- Layout changes. Moving the sink or range means new plumbing and electrical, which pushes a straightforward swap into a bigger job. Keep the plumbing where it is and you keep more of your budget for better materials.
What Cabinets & Countertops Costs in Allen, TX
Expect $14,000 – $45,000 for a full cabinet and countertop replacement in Allen. That spread is wide because the job has real variables, and here’s what moves the number from one end to the other:
- Kitchen size and cabinet count. A galley kitchen and a big open-plan layout with an island are different jobs. More boxes, more doors, more labor.
- Cabinet grade. Stock vs. semicustom, and the door material, can swing thousands on the same footprint.
- Counter material. Quartz and granite at different grades sit at different price points, and the edge profile and thickness add to it.
- Existing condition. Out-of-square walls, old plumbing, or a floor that needs leveling all add prep time.
- Layout changes. Relocating plumbing, gas, or electrical for a new sink or range position is the biggest single add.
A written estimate from us itemizes the cabinet line, counter material and edge, demo, prep, install, and any rough-in work. What it typically doesn’t cover: appliance purchases, structural changes like removing a load-bearing wall, and any surprise the walls reveal after demo. If we find one, you get a written change order with a number on it before we proceed. No-hassle upfront pricing means the number you see is the number you pay.

See the difference
Before
After
Before
After
Before
AfterWhat Allen Homes Specifically Do to This Job
Allen is unusual in the Dallas suburbs because so much of its housing stock landed in a narrow window. The town was small and rural until the late 1980s, then it boomed as a Collin County suburb, which means most of the homes in ZIP codes 75013 and 75002 were built between roughly 1990 and 2015. Contractors here aren’t doing the patchwork remodel of an older inner-ring city; they’re working first-cycle replacements on 25- to 30-year-old subdivision stock all at once, and kitchens from that era are hitting the point where the cabinets are tired and the laminate counters are done.
That build era matters for cabinet work. Those 1990s builds often have soffits above the uppers that new taller cabinets won’t clear without modification, and we see it constantly in the master-planned subdivisions off Exchange Parkway and near the US-75 corridor. The north Texas clay under Allen’s slab foundations adds a second wrinkle: when the slab shifts with the wet-dry cycle, wall cabinets can pull away from the wall and doors start rubbing. If we catch that during tear-out, we’ll flag it before we hang new boxes, because hanging a level cabinet on a moving wall is a waste of your money. We also work throughout Allen and the surrounding Collin County neighborhoods, so we know what these kitchens look like before we walk in.
If your cabinets and counters are going in as part of a full Kitchen Remodeling in Allen, the sequencing is the same, just with more trades in the mix. And some Allen homeowners pair new cabinets with a layout change that opens the kitchen into a converted garage or a new addition, which is where our Garage Conversion ADU in Allen work and New Detached ADU in Allen projects overlap.
Serving Allen, TX – Our Local Coverage Area
We serve Allen and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions About Cabinets & Countertops in Allen

Most full cabinet and countertop replacements take three to five weeks from demo to final walkthrough, with the countertop fabrication window being the biggest variable. Stock cabinets can move faster; semicustom lines and a complex stone edge push toward the longer end. Call (844) 560-0925 for a timeline based on your actual kitchen.
A straight cabinet and counter swap generally doesn’t require a permit, but moving plumbing, gas, or electrical for a new sink or range position typically does. We pull the permit and handle the inspection when the scope calls for it, so you’re not stuck trying to sort out the city’s requirements on your own. Call (844) 560-0925 and we’ll tell you whether your job needs one.
Yes, and it’s the best way to keep the budget where you want it. Keeping the sink, range, and existing walls in place lets you put more money into better cabinets and stone instead of rough-in work. If you want a layout change, we’ll show you what it costs before you commit.
Most Allen projects land between $14,000 and $45,000, depending on kitchen size, cabinet grade, counter material, and whether the layout changes. A written itemized estimate gives you the real number for your kitchen. Call (844) 560-0925 for a free estimate.
Every cabinet and countertop job is covered by our 730-Day Done Right Promise, one of the longest workmanship guarantees in the residential construction space. If something isn’t done right, we make it right. Call (844) 560-0925 to schedule your free estimate.
Get a Free Cabinets & Countertops Estimate in Allen
Call (844) 560-0925 and we’ll set up a free on-site estimate for your Allen kitchen. You’ll get a written, itemized number for cabinets, counters, and install, a realistic timeline, and straight answers on whether your layout needs a permit. Calls are answered by a live person around the clock. From your first measurement to the final walkthrough, the number you see is the number you pay.