A Groundwork company - serving Carrollton, TX
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood
Cabinets & Countertops · Allen, TX

Cabinets & Countertops in Allen - Free Estimate, One Written Price

Free on-site estimate and a written, line-item quote before any work begins. One contract, one crew, one accountable point of contact. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Carrollton
New painted shaker cabinets with an organized deep drawer
A remodeled kitchen with a waterfall island and wood cabinets
An open kitchen and dining area after a remodel
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A walk-in shower with large-format tile and a built-in niche
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Cabinets & Countertops in Allen, TX: What the Job Actually Involves

Cabinets & countertops in Allen, TX typically run $14,000 – $45,000 for a full kitchen’s worth of new cabinetry and stone, and most projects take three to five weeks from demo to final walkthrough. The timeline hinges on cabinet lead time, not labor: stock lines land in days, semicustom in two to four weeks, and a countertop template can’t happen until the boxes are hung and leveled. Call (844) 560-0925 and we’ll talk through your kitchen, your budget, and what’s realistic before anyone touches a cabinet door.

Professional contractor installing a marble kitchen countertop during a home remodel in Allen, TX

Call (844) 560-0925

Here’s the part most Allen homeowners don’t hear up front. Cabinets and counters are one job with two halves that refuse to overlap. The counter can’t be measured until the cabinets are set and shimmed. The counter can’t be installed until it’s fabricated. Get the sequence wrong and you’re eating weeks of dead time with a kitchen full of cardboard boxes.

How We Run a Cabinet and Countertop Job in Allen

Installers leveling a new base cabinet during a kitchen remodel

Day one: tear-out and protect. We pull the old doors, drawers, boxes and counter, shut off and cap the water lines to the sink, and protect the floors and adjacent rooms. This is a one-to-two-day stage on a typical Allen kitchen. Before demo, you’ve already locked in your cabinet line, door style, finish and counter material. That decision drives everything downstream, so it’s made first, not last.

Days two through four: prep and rough-in. This is where the walls tell you what they’ve been hiding. On Allen’s 1990s and 2000s slab homes, we regularly find out-of-square walls behind the old cabinets and a lazy Susan cutout that no new box lines up with. We true up the walls, patch and prime, and handle any electrical or plumbing moves you approved. If you’re adding a dishwasher circuit or relocating the sink, it happens now, not after the stone goes in.

Days five through seven: cabinet install. Base boxes first, then uppers, then leveling and shimming. A cabinet run out of level by a quarter inch shows up as a two-inch gap at the counter seam, so we don’t rush this. You decide at this stage on filler strips, crown, and any end panels that finish the exposed sides.

Week two: template, then fabrication. Once the base cabinets are set, the countertop fabricator templates the actual run. That template is a physical record of your kitchen, and nothing gets cut until it’s signed off. Fabrication runs five to ten business days for most quartz and granite. You’re without a working sink for part of this window, and we plan around it.

Install and punch list. Stone goes in, sink and faucet set, and the final walk happens with you in the room. We check every door and drawer, every seam, and every caulk line before we call it done. Cabinets and counters are covered under our 730-Day Done Right Promise, so if a door sags or a seam opens in the first two years, we come back and make it right.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Choices You’ll Actually Make

The cabinet and counter decisions carry the most weight, and they’re the ones homeowners second-guess longest. Here’s the honest trade-off on each.

  • Stock vs. semicustom cabinets. Stock lines are the fastest and cheapest route, but they come in fixed sizes, so you’re designing around the box. Semicustom lets you hit the wall exactly and pick interior fittings. KraftMaid’s semicustom line is what most Allen homeowners land on when the kitchen has an odd corner or a soffit to work around.
  • Quartz vs. granite. Quartz is engineered, non-porous, and doesn’t need sealing, which suits a busy Allen household with kids. Granite is natural, harder to chip, and every slab is one of a kind, but it takes a reseal every year or two. Cambria quartz is a common pick for the clean, consistent look.
  • Door construction and finish. Painted MDF doors look great and cost less, but they show wear faster in a heavy-use kitchen. Solid wood and plywood boxes hold up longer and take a refinish down the road.
  • Counter thickness and edge profile. A 2cm or 3cm slab changes the price, and so does the edge. A basic eased edge is included; a mitered or double-thick edge adds labor and material.
  • Layout changes. Moving the sink or range means new plumbing and electrical, which pushes a straightforward swap into a bigger job. Keep the plumbing where it is and you keep more of your budget for better materials.

What Cabinets & Countertops Costs in Allen, TX

Expect $14,000 – $45,000 for a full cabinet and countertop replacement in Allen. That spread is wide because the job has real variables, and here’s what moves the number from one end to the other:

  • Kitchen size and cabinet count. A galley kitchen and a big open-plan layout with an island are different jobs. More boxes, more doors, more labor.
  • Cabinet grade. Stock vs. semicustom, and the door material, can swing thousands on the same footprint.
  • Counter material. Quartz and granite at different grades sit at different price points, and the edge profile and thickness add to it.
  • Existing condition. Out-of-square walls, old plumbing, or a floor that needs leveling all add prep time.
  • Layout changes. Relocating plumbing, gas, or electrical for a new sink or range position is the biggest single add.

A written estimate from us itemizes the cabinet line, counter material and edge, demo, prep, install, and any rough-in work. What it typically doesn’t cover: appliance purchases, structural changes like removing a load-bearing wall, and any surprise the walls reveal after demo. If we find one, you get a written change order with a number on it before we proceed. No-hassle upfront pricing means the number you see is the number you pay.

Two construction workers installing wooden kitchen cabinets on a job site. in Allen, TX
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Allen Homes Specifically Do to This Job

Allen is unusual in the Dallas suburbs because so much of its housing stock landed in a narrow window. The town was small and rural until the late 1980s, then it boomed as a Collin County suburb, which means most of the homes in ZIP codes 75013 and 75002 were built between roughly 1990 and 2015. Contractors here aren’t doing the patchwork remodel of an older inner-ring city; they’re working first-cycle replacements on 25- to 30-year-old subdivision stock all at once, and kitchens from that era are hitting the point where the cabinets are tired and the laminate counters are done.

That build era matters for cabinet work. Those 1990s builds often have soffits above the uppers that new taller cabinets won’t clear without modification, and we see it constantly in the master-planned subdivisions off Exchange Parkway and near the US-75 corridor. The north Texas clay under Allen’s slab foundations adds a second wrinkle: when the slab shifts with the wet-dry cycle, wall cabinets can pull away from the wall and doors start rubbing. If we catch that during tear-out, we’ll flag it before we hang new boxes, because hanging a level cabinet on a moving wall is a waste of your money. We also work throughout Allen and the surrounding Collin County neighborhoods, so we know what these kitchens look like before we walk in.

If your cabinets and counters are going in as part of a full Kitchen Remodeling in Allen, the sequencing is the same, just with more trades in the mix. And some Allen homeowners pair new cabinets with a layout change that opens the kitchen into a converted garage or a new addition, which is where our Garage Conversion ADU in Allen work and New Detached ADU in Allen projects overlap.

Serving Allen, TX – Our Local Coverage Area

We serve Allen and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked Questions About Cabinets & Countertops in Allen

A new wood side gate with black hardware

Get a Free Cabinets & Countertops Estimate in Allen

Call (844) 560-0925 and we’ll set up a free on-site estimate for your Allen kitchen. You’ll get a written, itemized number for cabinets, counters, and install, a realistic timeline, and straight answers on whether your layout needs a permit. Calls are answered by a live person around the clock. From your first measurement to the final walkthrough, the number you see is the number you pay.

Written by the team at Groundwork Construction Co.

Why Allen Chooses Groundwork Construction Co. of Carrollton

We set the standard for cabinets & countertops in Allen.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Allen

Getting your cabinets & countertops project started is simple.

1

Call or Request a Free Estimate

Tell us about your cabinets & countertops project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local cabinets & countertops pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Allen Customers Say

Trusted by homeowners across Allen and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new white vinyl privacy fence with a double gateA remodeled hall bathroom with patterned floor tile and painted wallsA wood double vanity with two mirrors after a bathroom remodelA finished backyard cottage with a small covered porchA new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patio

More services in Allen

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Carrollton

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Carrollton team

A local vetted partner works across Carrollton and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Cabinets & Countertops in Allen?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Allen.

(844) 560-0925

Request a Free Estimate in Allen

Tell us about your cabinets & countertops needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch