A Groundwork company - serving Carrollton, TX
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Dallas, TX

Garage Conversion ADU in Dallas - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Carrollton
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Garage Conversion ADU in Dallas: What It Costs and How Long It Takes

A garage conversion ADU in Dallas typically runs $45,000 to $130,000 and takes 3 to 5 months from permit to final inspection. That covers turning an existing attached or detached garage into a permitted, separately metered living space with its own kitchenette, bathroom, and sleeping area. The number swings hard depending on whether you’re keeping the existing plumbing path or running new sewer, and whether the garage slab can carry habitable-space loads or needs foundation work to get there. Call (844) 560-0925 for a free on-site estimate.

Two construction workers installing siding on a home addition project in Dallas, TX

Call (844) 560-0925

How a Garage Conversion ADU Comes Together, Stage by Stage

A single-story rear room addition with tall windows and a new patio

Converting a garage isn’t a remodel with a car removed from the middle. It’s a change of occupancy, and Dallas code treats it that way. Here’s the actual sequence we run.

Stage 1 – Walk-through and feasibility (day 1). We measure the slab, check ceiling height against habitable-space requirements, and trace where the sewer, water, and electrical currently sit. This is the decision point for the single biggest fork in the job: can the existing bathroom-adjacent slab support a new toilet drain, or do we break concrete and relocate the sewer line? That one answer moves the budget by a five-figure margin, so it gets settled before anyone signs anything.

Stage 2 – Design, engineering, and permits (weeks 1-6). A converted garage needs a sealed set of drawings and engineering if the slab or any load-bearing change is involved. Dallas permitting runs through the city’s building department, and plan review on an ADU scope typically takes 3 to 6 weeks depending on how many comments come back. You’ll be making fixture and layout decisions during this window, not later.

Stage 3 – Demo and structural prep (weeks 6-8). The garage door comes out and gets framed in. We remove the old slab edge where plumbing needs to travel, address any foundation cracking or settlement the garage has quietly accumulated, and check the existing wall framing for water damage from years of a leaky door or failing roof edge. On a Dallas garage, this is where surprises live, and we photograph everything before it’s closed up.

Stage 4 – Rough-in and framing (weeks 8-12). Plumbing, electrical, HVAC, and insulation go in, followed by rough inspection. This is where a garage’s thin walls and unconditioned slab get brought up to habitable-space standards, and where you decide how the unit gets heated, cooled, and metered.

Stage 5 – Finish and final inspection (weeks 12-20). Drywall, flooring, kitchenette, bathroom tile, and paint. Final inspection and certificate of occupancy land here. We walk it with you before the city does.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The Options You’ll Choose Between

Most of the design decisions on a garage conversion ADU come down to four or five forks. Here’s what actually matters and what each choice costs you.

  • Slab stay or slab break. Keeping the existing slab is the money-saver. Breaking it to relocate plumbing is the honest option when the geometry doesn’t work. Breaking and re-pouring adds meaningful cost but solves drain-slope and venting problems that patching over won’t.
  • Full kitchen vs. kitchenette. A two-burner cooktop, sink, small fridge, and microwave keeps the unit in the lower third of the range. A full range and dishwasher push it up and often trigger additional ventilation and electrical requirements.
  • Metering. A sub-meter lets you track tenant usage without a second utility account. A separate meter is cleaner for a long-term rental but adds utility coordination and cost.
  • Heating and cooling. A ductless mini-split is the practical route for most converted garages because it doesn’t depend on extending the house’s existing ductwork. Extending central air only works if the main system has capacity to spare, and garages rarely share a duct path cleanly.
  • Windows and doors. The old garage door opening is the biggest envelope decision. A framed wall with correctly sized egress windows is required for the sleeping area; Therma-Tru and ES Windows products are what we commonly specify where the local supply supports it, and the trade-off is cost versus how much daylight and street presence you want the unit to have.
  • Flooring. Luxury vinyl plank handles a slab that moves. Tile is more durable but cracks if the foundation shifts. Carpet is cheapest and the wrong call for a garage slab in Dallas.

Those choices are also why this is part of a Home Additions & ADU in Dallas conversation – the wider scope decisions (site, utilities, financing) get made alongside the garage scope.

What a Garage Conversion ADU Costs in Dallas, TX

Expect $45,000 to $130,000 for a permitted garage conversion ADU in Dallas. Where a given job lands depends on five variables:

Two construction workers framing a wall for a home addition project in Dallas, TX
  • Garage size and existing condition. A 400 sq ft single-car garage and a 700 sq ft detached two-car are different jobs. A garage that’s been leaking for a decade costs more to bring up to habitable standard.
  • Plumbing relocation. Keeping the drain path is the low end. Breaking the slab and running new sewer is the high end, and it’s the single largest single-line swing.
  • Structural and foundation work. Garage slabs weren’t poured for habitable loads. Any slab repair or pier work adds cost.
  • Finish grade. Builder-grade versus a real kitchen and a tiled bathroom is a wide spread.
  • Permit scope. A full ADU with certificate of occupancy carries more review and inspection than a partial conversion, and the fees reflect that.

A written, line-item estimate from us spells out demo, framing, plumbing, electrical, HVAC, insulation, drywall, flooring, fixtures, permits, and inspection support. What it won’t include unless you ask: landscaping repair around the new unit, furniture, and any utility connection fees the city charges separately. Upfront pricing, no surprises – the number you see is the number you pay.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Dallas Homes Specifically Do to This Job

Dallas sits on expansive black-clay soil that swells and shrinks through the wet-dry cycle, and that single fact reshapes a garage conversion here more than in most Texas metros. After a dry summer the clay under a slab shrinks and cracks open, then fall rains swell it back. Foundation cracks and sticking doors show up in clusters, and garage slabs are where that movement hides longest because nobody’s watching them. Before we frame a single wall, we check the slab for cracking and settlement – especially on the pier-and-beam bungalows in East Dallas and Oak Cliff, where a sagging garage floor is a signal, not a cosmetic issue.

The housing stock across ZIPs 75210 and 75286 ranges from 1920s-40s bungalows to 1950s-70s shallow-slab ranch homes, with new infill townhomes rising between them. That range means we’re often dealing with a garage built to 1965 standards sitting next to a rebuild that meets modern code. Dallas permitting runs through the city’s building department, and plan review on an ADU scope typically takes 3 to 6 weeks. Hot summers and periodic freezes stress plumbing and masonry, so we schedule exterior work and roof-edge repairs around that cycle rather than fighting it. If the property needs driveway access reworked as part of the conversion, homeowners often pair this with Asphalt Driveways & Resurfacing in Dallas or Concrete Driveways & Concrete Work in Dallas while the equipment is already on site.

Serving Dallas, TX – Our Local Coverage Area

We serve Dallas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked – Garage Conversion ADU in Dallas

A framer checking new wall framing on a home addition

Get Your Free Garage Conversion ADU Estimate in Dallas

Call (844) 560-0925 to schedule a free on-site estimate for your garage conversion ADU in Dallas. A live person answers, 24/7 – no voicemail black holes. We’ll walk the garage, tell you honestly whether the slab and plumbing path work in your favor, and hand you a written, line-item number covered by the 730-Day Done Right Promise. Projects over $10,000 get $1,000 off, and 0% financing for 18 months is available. From foundation to finish line, one contractor, one accountable number.

Written by the team at Groundwork Construction Co.

Why Dallas Chooses Groundwork Construction Co. of Carrollton

We set the standard for garage conversion ADU in Dallas.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Dallas

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Dallas Customers Say

Trusted by homeowners across Dallas and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A standing-seam metal roof over a covered porchA new bay window with a cushioned seatA new wood side gate with black hardwareA stone counter, tile backsplash and open shelf after a kitchen remodelA remodeled hall bathroom with subway tile and a floating vanityNew architectural shingles with a clean valley

More services in Dallas

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Carrollton

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Carrollton team

A local vetted partner works across Carrollton and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Dallas?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Dallas.

(844) 560-0925

Request a Free Estimate in Dallas

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch