Garage Conversion ADU in Richardson, TX: What It Costs and How Long It Takes
A garage conversion ADU in Richardson, TX typically runs $45,000 – $130,000 and takes 8 – 14 weeks from permits to final inspection. The job turns an attached or detached garage into a finished, code-compliant living space: new slab or floor system over the existing pad, framing and insulation for the new thermal envelope, plumbing and electrical, HVAC, drywall, finishes, and a separate entrance. Because you’re working inside an existing footprint, most Richardson conversions skip the site work and surveying that slow down a detached build. Call (844) 560-0925 to set up a free on-site estimate.

How a garage conversion ADU gets built here, stage by stage

We run conversions as a fixed sequence so you know what’s happening and what you need to decide, and so the inspection schedule doesn’t stall the trades. Here’s the real order of operations.
Stage 1: Feasibility and permit set (weeks 1 – 3)
Day one is a walkthrough of the garage, not a demo day. We measure the slab, check for grade slope and any settlement, trace where the plumbing and electrical come in, and confirm headroom, egress, and energy-code path against the current adopted building code. You decide at this stage whether the kitchenette and bathroom are in or out, since that choice reshapes the plumbing plan. Richardson permits on a conversion and the plan review runs a few weeks, and no framing starts until the permit is in hand.
Stage 2: Slab prep, demo, and framing (weeks 3 – 5)
We pull the garage door and opener, remove the old apron and any raised curb, and evaluate the existing slab. Many Richardson garages sit 4 – 6 inches below the house floor, so we either pour or build a floor system up to a common level with a vapor barrier and insulation underneath. Then come the stud walls (lifted from any unfinished stock), new framing for the bathroom and closet partitions, and the exterior wall where the garage door was, closed and sheathed. This is where foundation movement shows up: on west Richardson slabs over the blackland clay, we check for cracking and either repair or design the floor system to float over it.
Stage 3: Rough-in trades (weeks 5 – 8)
Plumbing, electrical, and HVAC go in simultaneously, then the city inspects all three before anything is closed up. A detached two-car garage may need a new sewer line trenched out to the main, which is one of the biggest single cost swings on the job. You choose the HVAC approach here: a mini-split (simpler, no ductwork) or a ducted unit tied to the house. During rough-in the homeowner picks fixture color and layout for the bath and kitchenette so trim arrives on time.
Stage 4: Insulation, drywall, and finishes (weeks 8 – 12)
We insulate to the energy-code R-value for the new conditioned space, hang and finish drywall, then set cabinets, tile, flooring, and paint. Richardson summers hit 100°F, so we schedule attic access and any exterior work early in the day and keep inside work moving in climate-controlled space.
Stage 5: Final inspection and handoff (weeks 12 – 14)
Final inspection checks egress, smoke and CO alarms, GFCI protection, and that fixtures meet code. The 730-Day Done Right Promise starts at the walkthrough, when we go room by room and you sign off on a punch list. Our technicians have up to 12 years of experience, and background-checked, uniformed technicians handle every stage. Full scope above the ADU belongs with our Home Additions & ADU in Richardson work.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices you’ll make: systems, materials, and finishes
A garage conversion is really five decisions stacked on each other. Here’s what each one costs you in money and in how the space holds up.
- Heating and cooling: a ductless mini-split is the simpler, less invasive choice and runs lower upfront, while a ducted system tied to the house is right when the ADU is large or you want one thermostat. Mini-splits cost less to install but add a wall-mounted head per zone; ducted needs the chase and a load calculation.
- Floor construction: a new insulated floor system over the existing slab handles grade and moisture better but adds framing cost; finishing the existing slab is cheaper and works only when the elevation and drainage check out.
- Flooring: luxury vinyl plank is the practical choice in a converted garage, since it tolerates temperature swings and humidity shift better than hardwood. Porcelain tile holds up even better in a bath and costs more installed.
- Kitchenette and bath fixtures: a compact sink, induction cooktop, and stacked washer/dryer widen the rental appeal; a wet-bar sink saves plumbing. We can spec Grohe fixtures where durability matters most, and keep budget lines where it doesn’t.
- Exterior envelope: the wall that replaces the garage door takes new siding and windows. We match existing brick or step up to GAF or CertainTeed products for the roof if the garage roof is on the same slope.
- Energy upgrades: new low-E windows and upgraded insulation raise the build cost but lower the operating cost of a rented unit and keep summer heat out of the space.
What a Garage Conversion ADU costs in Richardson, TX
Plan on $45,000 to $130,000 for a full conversion here. A straightforward attached two-car conversion with a bath and kitchenette usually lands in the middle of that band; a detached garage that needs a new sewer run, HVAC, and a separate address pushes to the top.
The four variables that move the number:

- Garage position and size: an attached garage already has utilities nearby; a detached garage can need a concrete trench and a new sewer tie-in, which is the single biggest swing.
- Existing slab and framing condition: foundation repair, leveling, or a rebuild of the floor system over the clay soils adds cost. Straightforward slabs sit at the low end.
- Bath and kitchenette scope: a full bath plus kitchenette with a stackable washer/dryer adds several thousand over a half-bath and wet bar. Relocating plumbing farther from the main line costs more.
- Material and finish grade: builder-grade finishes anchor the low end; tile showers, custom cabinetry, and upgraded windows climb toward the ceiling.
- Permit scope: a code-minimum conversion draws a smaller permit and inspection load than one with structural changes or a new HVAC system.
A written line-item quote from us shows demo, framing, MEP rough-in, insulation, drywall, finishes, and the permit allowances separately, so you see what the inspections cost and what they don’t. It also lists what’s often excluded elsewhere: the sewer run to the main, foundation repair, and the appliance package.
See the difference
Before
After
Before
After
Before
AfterWhat Richardson homes specifically do to this job
Richardson’s core was built out in the 1950s – 70s around the Telecom Corridor, so most of the garages we convert are attached two-cars on 1955 – 1975 brick-veneer ranch homes. That era means slab foundations on the North Texas blackland clay, which moves seasonally, and many of these slabs have cracks or a settled corner by now. We check the slab before we promise a floor plan, and on west-side homes near the older streets it’s common to design the new floor system to float over a repaired or stabilized slab rather than framing directly onto it. The payoff is that conversions here rarely involve new raw land or grading, so the work is almost all renovation.
The older homes also carry cast-iron drain lines and, on some 1960s and 1970s builds, aluminum branch wiring, so the plumbing and electrical rough-in often includes upgrading those before we tie in the new bath. ZIPs 75080 and 75081 are the heart of that stock. Across Central Expressway toward the Campbell Road corridor in 75082, garages are newer 1980s – 2000s construction with fewer foundation issues but more two-story geometry, which can change where HVAC lines run. Richardson’s repeated tear-down rebuilds mean some lots sit next to brand-new homes, so survey and drainage questions matter when a detached garage ADU is involved. And with occasional tornado and severe spring storms, we build the roof tie-in and exterior to handle hail and wind like the house.
We cover Richardson and the surrounding towns, and the local permitting and inspection rhythm is part of what we plan around on every conversion. Homeowners often pair a conversion with a new driveway or fresh approach, and we handle Concrete Driveways & Concrete Work in Richardson and Asphalt Driveways & Resurfacing in Richardson as part of the same project. It’s all covered by our Home Additions & ADU service line.
Serving Richardson, TX – Our Local Coverage Area
We serve Richardson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – Garage Conversion ADU in Richardson

Most conversions take 8 to 14 weeks from permit approval to final inspection. The slowest stretch is usually plan review and rough-in inspections, since framing, plumbing, electrical, and HVAC all have to clear the city before drywall goes up. Call (844) 560-0925 for a timeline based on your garage.
Yes, a conversion to habitable space requires a building permit and inspections in Richardson. You’re changing the use of the structure and adding plumbing, electrical, and HVAC, so the city reviews plans and inspects the rough-in and final stages. We handle the permit process as part of the job.
Often, yes, if the new bath sits close enough to the existing main line to tie in without a long run. A detached garage usually needs at least a new line out to the main. The honest answer depends on where the garage sits relative to the house drain, which we confirm on the first visit. Call (844) 560-0925 for a walkthrough.
Expect $45,000 to $130,000 depending on whether the garage is attached or detached, how much plumbing runs beyond the existing main, and finish grade. Call (844) 560-0925 for an exact quote, line-item and in writing, with a free estimate.
Every garage conversion carries our 730-Day Done Right Promise: if it isn’t done right, we make it right, for two years. Materials come with their manufacturers’ warranties on top of that. Call (844) 560-0925 with questions before you start.
Get a free estimate on your Richardson garage conversion ADU
We’ll come out, measure the garage, check the slab and utilities, and give you a written line-item estimate at no charge, so you can price your conversion with real numbers instead of a guess. Our technicians have up to 12 years of experience, and every conversion is covered by the 730-Day Done Right Promise. Call (844) 560-0925 to schedule your free estimate for a garage conversion ADU in Richardson.