







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterADU Contractors Near Me in Carrollton, TX: What to Verify Before You Sign
If you’re searching “ADU contractors near me” in Carrollton, the short answer is this: hire a contractor who carries general liability and workers’ comp written specifically for new accessory-structure construction, not just remodel work, and who builds a site-specific stormwater plan into your permit package from day one. Most Carrollton ADU projects run $90,000-$220,000 and take 8-16 weeks on site, and the two things that sink them aren’t the framing or the finishes. They’re a held certificate of occupancy and a defect discovered in year two. Call (844) 560-0925 and a live person answers, any hour, to talk through your lot.

Here’s the local reality. Carrollton sits in a basin that NCTCOG has flagged for tighter impervious-cover limits. Every ADU you add puts more hard roof and slab on your lot, and once you cross the threshold, the city wants a stormwater review before it will close out your permit. We’ve watched quality builds stall at the finish line because the drainage plan got treated as a punch-list item instead of a design input. That’s the gap this page is about.

Why drainage compliance decides whether your Carrollton ADU gets its CO
Carrollton’s drainage and alley-access rules run stricter than what you’ll find in Plano or Farmers Branch, and the postwar ranch lots across the older tracts weren’t laid out with a second dwelling in mind. When we scope Home Additions & ADU work here, the stormwater plan is drawn alongside the floor plan, not retrofit after a plan reviewer flags it.
What that looks like in practice:
- Impervious-cover math before design. We calculate existing hard surface and the ADU’s footprint together, so we know early whether you need on-site detention, a rain garden, or regraded swales to stay compliant.
- Alley and staging constraints. Older Carrollton neighborhoods restrict where a concrete truck can stage and where a dumpster can sit. Get that wrong and you’re rescheduling pours and eating delays.
- Grading that ties into the existing house. An ADU that sheds water toward your 1960s ranch slab is a foundation problem waiting to happen.
We’ve seen structurally sound ADUs fail final inspection over a missing stormwater detail. It’s avoidable, and it starts with the first drawing.
Clay soil, shared utility connections, and the 2-3 year crack
North Texas clay expands and contracts with every wet and dry swing. That movement matters most where the ADU meets the main house: the utility trench, the shared connection points, the walkway. Build the ADU on a slab spec that doesn’t account for differential movement relative to the primary structure and you can get cracking at those shared connections within a couple of years. The fix is engineered slab detail up front, which is why we don’t price an ADU here without soil and foundation specs in hand.
The local housing stock adds its own wrinkle. Most Carrollton homes are 1950s-1980s ranch builds with shallow pier-and-beam or slab foundations and aging cast-iron drain lines. Tie a new ADU’s plumbing into a drain line that’s already failing and you inherit the problem. We check the existing line before we connect to it.

Insurance that actually covers an ADU build (not just a kitchen)
General liability and workers’ comp for ground-up accessory-structure construction are not the same policies as remodel coverage. Ask any contractor you interview to show current certificates naming that scope. A build that runs 8-16 weeks in your backyard, with crews passing your utility meters and using your alley gate daily, is a different risk profile than a two-week bathroom job. If the coverage is thin, the exposure lands on you, the property owner.
The people on your lot should be verifiable too. Our technicians are background-checked and arrive in uniform on every project, and they’ve got up to 12 years of experience. That matters when a stranger is in your yard for months.
What an ADU in Carrollton costs, and where the money goes
For this market, ADU construction runs $90,000-$220,000. Garage conversions are the smaller line item at $30,000-$80,000, while a full standalone ADU lands in the $90,000-$220,000 band depending on size, site work, and finish level. Home additions that aren’t full ADUs run $45,000-$130,000. These are the ranges we quote against, and we put the number in writing before work starts.

| Project type | Typical Carrollton range |
|---|---|
| ADU construction | $90,000-$220,000 |
| Garage conversion | $30,000-$80,000 |
| Home addition | $45,000-$130,000 |
Upfront pricing means the number you see is the number you pay. For larger builds, we offer 0% financing for 18 months and $1,000 off projects over $10,000, so a rental ADU or a multigenerational suite doesn’t have to drain cash reserves in one pass.
Materials that hold appraisal value and keep tenants
An ADU built for rental income or an aging parent should match the primary home, not undercut it. Our curated brand partners across every trade matter here: KraftMaid cabinets and Cambria counters in an ADU kitchen, Andersen windows, GAF roofing. Same tier as the house next door. That protects your appraisal and helps you keep a good tenant.
The business case for the 730-Day Done Right Promise
On a rental ADU, a workmanship defect in year one is lost rent and a contractor dispute at the same time. Our 730-Day Done Right Promise is simple: if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in the residential construction space, and on an income property it’s the difference between a quick fix and a vacant unit. From foundation to finish line, it’s built to last and backed in writing.
We’ve been in business since 2014 and serve homeowners across our markets with these same commitments. Groundwork Construction Co. of Carrollton connects you with independent local professionals who do the work, and every project carries the same guarantee.
A few common Carrollton scenarios we see
- The rental ADU on a tight ranch lot. Impervious-cover math comes first, then layout, because the lot was platted before anyone planned for a second dwelling.
- The multigenerational suite. Garage conversion with a full bath and kitchenette, built to the same material standard as the main home so the family stays comfortable and the value holds.
- The alley-restricted addition. Staging and pour logistics planned around the constraints, so we’re not rescheduling concrete trucks mid-build.
Availability and how to start
Live people answer our phones 24/7, no voicemail black holes and no waiting until Monday. Call with your address and lot details and we’ll talk through the stormwater question, the foundation spec, and a realistic range before you commit to anything. Free project estimate and design consult included.
FAQs
Often yes. Adding an ADU increases impervious cover, and Carrollton’s basin sits under tighter impervious-cover limits than neighboring cities, so a stormwater review can be required before your certificate of occupancy is issued. We build drainage compliance into the permit package from the design phase so it doesn’t stall you at the finish line. Call (844) 560-0925 for a free estimate and we’ll check your lot.
ADU construction in Carrollton typically runs $90,000-$220,000, with garage conversions at $30,000-$80,000 and home additions at $45,000-$130,000. Your final number depends on size, site work, and finish level, and we put it in writing before work starts. Call (844) 560-0925 for an exact quote; estimates are free.
Garage conversion is usually the lower-cost route at $30,000-$80,000 versus $90,000-$220,000 for a standalone ADU, and it sidesteps some of the impervious-cover math since you’re not adding footprint. Which one fits depends on your lot, your goal (rental income or family housing), and the existing structure. Call (844) 560-0925 and we’ll walk through both.
Timelines depend on permitting and your lot’s stormwater requirements, but builds typically run 8-16 weeks on site once permits clear. Call (844) 560-0925 to talk scheduling and get a free estimate.
Ready to stop searching and start building? Call Groundwork Construction Co. of Carrollton at (844) 560-0925 for a free project estimate and design consult. Upfront pricing, 0% financing for 18 months, $1,000 off projects over $10,000, and the 730-Day Done Right Promise behind every ADU we deliver.
Written by the team at Groundwork Construction Co. of Carrollton, serving Carrollton, TX.
What Our Customers Say
"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."
- Laura Bennett"Change orders were written down and priced before the work happened, every single time. No surprise at the end."
- Keisha Robinson"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."
- Angela Wong












