A Groundwork company - serving Carrollton, TX
A new rear addition with a vaulted beamed ceiling and tall windows
Garage Conversion ADU · Garland, TX

Garage Conversion ADU in Garland - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Carrollton
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

What a Garage Conversion ADU in Garland actually involves

A Garage Conversion ADU in Garland turns an existing attached or detached garage into a legal, rentable living space, and most projects here run $45,000 to $130,000 from demo to final inspection. A simple studio with a kitchenette and a 3/4 bath takes about 10 to 14 weeks; a full one-bedroom with a relocated laundry and a dedicated meter can stretch to 5 or 6 months. The number and the schedule both hinge on what’s under the slab and how much plumbing and electrical you’re moving. Call (844) 560-0925 and we’ll walk your garage, check the foundation, and give you a written line-item estimate.

Two construction workers installing siding on a home addition project in Garland, TX

Call (844) 560-0925

How we take a Garland garage from storage to a permitted unit

A single-story rear room addition with tall windows and a new patio

Every conversion moves through the same sequence, and the order matters because Garland’s inspections happen in stages. Here’s what actually happens week by week.

Stage 1: Assessment and permit drawings (weeks 1 – 3)

We start by measuring the slab, checking for the cracks and settlement that older Garland garages tend to carry, and confirming the ceiling height and framing. You’ll decide the layout, whether the unit is a studio or has a separate bedroom, and whether the garage door gets removed and framed in or stays as a decorative facade. From there an architect or designer drafts the permit set. Garland requires a site plan, floor plan, and energy compliance documentation before a permit is issued. This is the slowest stage because the city review clock is out of our hands, so getting the drawings right the first time saves weeks.

Stage 2: Demo and rough-in (weeks 3 – 5)

Day one of construction is demo: the overhead door and tracks come out, and any old shelving, water heater platform, or gas stub goes with it. Then the rough-in begins. Framing goes up for the new walls, plumbing lines are run for the kitchenette and bath, and electrical is pulled for outlets, lighting, and the panel upgrade your unit will need. If the slab has to be cut for a new drain line, that’s a decision point: cutting the slab adds cost and dust, while running a raised floor over it eats ceiling height. We show you both before anyone picks up a saw. Rough trades get inspected before anything is closed up.

Stage 3: Insulation, drywall, and systems (weeks 5 – 9)

Insulation and drywall close up the walls, then the finish trades come in. A mini-split goes in for heating and cooling, sized to the square footage of the unit, since Garland summers push a garage-turned-apartment harder than the main house. The bath gets tiled, the kitchenette gets set, and flooring goes down. You’ll pick your finishes around this stage: cabinet fronts, countertop, tile, and paint. That’s also when we set the appliances and connect the water heater.

Stage 4: Final inspections and finish-out (weeks 9 – 12)

Final inspections cover building, electrical, plumbing, and mechanical, and a Garland permit isn’t closed until all four sign off. We schedule those in the order the city wants them and handle the paperwork. Then it’s the punch list: trim touch-ups, a final clean, and a walkthrough with you. Anything that doesn’t hold up in the first two years is covered under the 730-Day Done Right Promise, which is one of the longest workmanship guarantees in residential construction.

Stage 5: Occupancy and the finish line (week 12+)

Once the certificate of occupancy is issued, your unit is ready for a family member or a tenant. We hand over the as-built drawings and inspection records. If you’re planning to rent it, that documentation matters for your records and for any future refinance or resale.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The options you’ll choose between

Most of the cost and feel of a Garland Garage Conversion ADU comes down to a handful of spec decisions. Here’s what we walk you through.

  • Slab cut vs. raised floor. Cutting the existing slab for a new drain keeps ceiling height and looks cleanest, but adds $2,000 to $4,000 and dust. A raised, insulated floor keeps the slab intact but eats 6 to 10 inches of headroom, which matters in a 1950s Garland garage that was never tall.
  • Prefab modular shell vs. stick-built inside the garage. A modular unit like those from Boxabl or Cover can be dropped and set, and it shaves weeks off the build. Stick-built lets you use every inch of the garage and match the house. For most Garland garages, stick-built fits the existing footprint better and lets you tie into the main house’s plumbing.
  • Mini-split vs. ducted system. A ductless mini-split is cheaper to install and efficient for a unit under 600 square feet. If your main house HVAC is near the end of its life, extending ductwork might make sense and gives you one system to service.
  • Galley kitchenette vs. full kitchen. A kitchenette (sink, two-burner cooktop, small fridge) keeps cost and plumbing runs down. A full kitchen with a range and full-size fridge adds $8,000 to $15,000 but makes the unit rentable as a standalone apartment.
  • Detached meter vs. shared utilities. A separate electrical meter and water tap make the unit a true ADU and easier to rent, but each tap adds to the bill. Sharing the main house utility is cheaper and simpler if the unit is for family.

What a Garage Conversion ADU costs in Garland, TX

For a garage conversion in Garland, plan on $45,000 to $130,000 depending on size, how much plumbing and electrical you relocate, and finish level. That range reflects the full job: design, permits, foundation work, framing, mechanical, and finishes.

The variables that push a job toward the low or high end:

Two construction workers framing a wall for a home addition project in Garland, TX
  • Square footage. A 300-square-foot single-car garage lands near the bottom. A 600-square-foot double garage with a bedroom jumps to the middle and up.
  • Foundation condition. Garland sits on expansive black-clay soil, and older slab-on-grade garages often have cracks or settlement. Leveling and re-piering before construction can add several thousand dollars, but skipping it means cracks in your new walls.
  • Plumbing and electrical relocation. Keeping the kitchen and bath close to existing supply lines saves money. A bath across the garage from the main stack adds pinhole and drain runs that cost more.
  • Panel capacity. Older Garland homes often have a 100-amp panel that won’t carry a new unit’s load. A service upgrade adds cost.
  • Finish grade. Luxury vinyl plank and a prefab shower keep the number down. Tile throughout and custom cabinetry push it up.

A written estimate from us is line-item, so you see every material and every labor line. What it doesn’t usually include: landscaping, connecting to the main house furnace if you go that way, and anything discovered behind the drywall after demo. We tell you when those come up before we touch them, which is what “upfront pricing, no surprises” means in practice. Ask about the $1,000 off on projects over $10,000 and 0% financing for 18 months while you’re on the call.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Garland homes specifically do to a garage conversion

Garland’s housing stock went up in one build-out from the 1950s through the 1970s, so almost every garage you’ll convert here is a postwar ranch or brick-veneer tract house. That single-era stock changes the job. Ceilings are lower than modern builds, which is why we check headroom before promising a layout. Many garages have a step-down slab, so we frame a small landing rather than fight the grade. Pier-and-beam garages need new piers before the unit carries a full bath and kitchen weight, and slab garages frequently show the movement that North Texas black-clay soils cause as they swell and shrink through the wet-dry cycle.

The permitting side is its own reality. Garland’s older platting and permit history sometimes means the city has to verify what was originally approved before it will sign off a new occupancy for a garage. Homes in the 75040 and 75041 ZIP codes, in established neighborhoods off Garland Road and in the areas near downtown Garland, tend to have the most complete records because those houses have been through remodels before. Newer areas further out, around the 75042 boundary, are more consistent. We pull the permits and handle the inspections, which matters when the city wants a full record of the conversion. This is a remodel-and-rehab market, not a new-build one, and the garage work here reflects that: we’re working with what a 1962 ranch gave us, not starting from open ground.

Serving Garland, TX – Our Local Coverage Area

We serve Garland and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked – Garage Conversion ADU in Garland

A framer checking new wall framing on a home addition

Ready to price your Garland Garage Conversion ADU?

Call (844) 560-0925 to schedule a free on-site estimate for your Garage Conversion ADU in Garland. We’ll walk the garage, check the slab, talk through the layout you have in mind, and leave you with a written line-item estimate and a realistic timeline. We also cover Garland and the surrounding areas, and if your project grows into more, see our Home Additions & ADU service or the wider Home Additions & ADU in Garland page. Many homeowners also pair a conversion with a new Concrete Driveways & Concrete Work in Garland project or Asphalt Driveways & Resurfacing in Garland to open up the parking the garage used to provide.

Written by the team at Groundwork Construction Co.

Why Garland Chooses Groundwork Construction Co. of Carrollton

We set the standard for garage conversion ADU in Garland.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Garland

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Garland Customers Say

Trusted by homeowners across Garland and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodelNew architectural shingles with a clean valleyNew double-hung windows in a dining roomA new front yard fence with a matching gateA new paver pool deck

More services in Garland

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Carrollton

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Carrollton team

A local vetted partner works across Carrollton and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Garage Conversion ADU in Garland?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Garland.

(844) 560-0925

Request a Free Estimate in Garland

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch