Cabinets & Countertops in Dallas, TX: What the Job Really Involves
A cabinets and countertops project in Dallas runs $14,000 – $45,000 for the full scope: tear-out, new cabinet boxes and fronts, countertop fabrication and install, and the plumbing and electrical tie-ins that come with them. Most projects finish in three to four weeks of active work once materials land. Call (844) 560-0925 and we’ll walk your kitchen, measure, and hand you a line-item estimate. No pressure, no vague ballparks.

Here’s the part most Dallas homeowners learn the hard way: the cabinets and counters are rarely the problem you’re pricing. The problem is what’s underneath them. More on that in a minute.
How we run a cabinets and countertops job, stage by stage

Five stages. Here’s exactly what happens and when, so you know what you’re paying for.
Stage 1: Walkthrough and field measure (day 1)
We come out, measure the actual room, and check what the walls are doing. In Dallas that matters more than in most cities. Out-of-plumb walls and out-of-level floors are common in older housing stock, and cabinets can’t be forced onto a wavy wall without showing gaps at the counter seam. We note appliance locations, plumbing stub-outs, and where the existing electrical runs. You decide the general layout and whether anything moves.
Stage 2: Design, selections, and order (weeks 1 – 2, mostly waiting)
You pick door style, finish, and countertop material here, and this is the decision that sets your final price. We confirm everything in writing: cabinet line, door style, hardware, countertop edge profile, sink cutout, appliance openings. Lead times for semi-custom cabinets are typically four to eight weeks in this market. This stage is a wait, not a work stage; we tell you that upfront so you can plan around it.
Stage 3: Demo and prep (days 1 – 2 of active work)
Old cabinets, counters, and backsplash come out. We inspect what’s behind them: water damage at the sink base, old valve types, wiring that isn’t to current code, and the wall surface itself. Anything unexpected gets photographed and quoted before we touch it. You approve or decline in writing.
Stage 4: Cabinet install and countertop template (days 3 – 5)
Base and wall cabinets get set, leveled, and shimmed. Then the countertop fabricator templates the actual installed cabinets, which takes a few hours, and cuts the slabs off-site. That gap is usually five to ten business days. You’re without a working counter for that stretch, so plan meals accordingly.
Stage 5: Countertop set, plumbing, and final walkthrough (days 6 – 8)
Counters go in, sink and faucet connect, and we handle the finish details. Then we walk the room with you and note anything that needs adjusting. The 730-Day Done Right Promise backs the whole install: if something isn’t right, we fix it, and that’s in writing.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The options you’ll actually choose between
Everyone focuses on color. The choices that drive your budget and how the room lives are these:
- Stock vs. semi-custom vs. custom cabinets. Stock is fastest and cheapest but comes in fixed sizes, so gaps get filled with filler strips. Semi-custom adjusts dimensions within a range and suits most Dallas homes. Custom is built to the inch and costs meaningfully more. KraftMaid sits comfortably in the semi-custom tier and handles irregular older rooms well.
- Particleboard vs. plywood boxes. Particleboard is standard and fine in dry conditions. Plywood boxes hold up better if a supply line ever leaks. In a Dallas kitchen where slab movement can stress plumbing, it’s worth the conversation.
- Quartz vs. granite vs. butcher block. Quartz is non-porous and needs no sealing. Granite is natural, unique, and needs periodic sealing. Butcher block is warm and repairable but requires oiling and shows water rings. Cambria quartz gives you consistent slabs if matching matters to you.
- Slab thickness and edge profile. 2cm vs. 3cm slabs, and a simple eased edge vs. a built-up mitered edge, changes both look and cost. Mitered edges read thicker and cost more in labor.
- Drawer and hinge hardware. Soft-close and full-extension drawers are upgrades that change daily use more than any finish choice. Worth the money.
What cabinets and countertops cost in Dallas, TX
Our Dallas lead range for this job is $14,000 – $45,000. Where you land inside that band depends on the variables below, not on the room’s square footage alone.

| Line item | Typical Dallas range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Kitchen island installation | $3,000 – $10,000 |
| Backsplash installation | $800 – $2,500 |
| Full cabinets & countertops project | $14,000 – $45,000 |
What pushes a job to the high end:
- Size and layout. A small galley runs the low end; a large kitchen with an island and pantry runs the high end.
- Existing condition. Water damage at the sink base, non-code wiring, or a wall that needs repair adds real cost.
- Moving plumbing or electrical. Relocating a sink or adding circuits for a new range means permits and trade work.
- Material grade. Custom cabinetry and large-format stone move the number up; semi-custom and standard-depth quartz keep it down.
- Structural changes. Removing a wall or adding an island with plumbing underneath adds scope.
A written estimate from us includes demo, cabinet supply and install, countertop fabrication and set, plumbing reconnection, and cleanup. It typically excludes appliance purchase, drywall repair beyond patch level, and any structural work found mid-job. Those get quoted separately, in writing, before we proceed. Upfront pricing means the number you see is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat Dallas homes specifically do to this job
Dallas sits on expansive black-clay soil that swells when it’s wet and shrinks when it’s dry, and that cycle shows up in kitchens. After a dry Texas summer, the clay under a slab shrinks and cracks open; fall rains swell it back. Floors heave, door frames rack, and cabinet boxes twist out of square. We regularly find cabinets in East Dallas and Oak Cliff bungalows that have pulled away from the wall or no longer sit flush on the floor, and that’s a foundation story before it’s a cabinetry story. We check pier-and-beam bungalows for sagging floors before we sign off on any sequence.
The housing stock adds its own wrinkle. Dallas mixes 1920s-40s pier-and-beam homes with 1950s-70s shallow-slab ranch houses and new infill townhomes, often on the same block. That means a kitchen in a 75214 bungalow may need floor leveling and wall furring before cabinets go in, while a 75205 rebuild is square and plumb. Permits run through the City of Dallas, and moving plumbing or adding circuits triggers inspection. We pull permits and pass inspections as part of the job. If you’re weighing a bigger scope, our Kitchen Remodeling in Dallas page covers the full project; homeowners often pair this with a Garage Conversion ADU in Dallas or a New Detached ADU in Dallas when they’re reworking the whole property.
Serving Dallas, TX – Our Local Coverage Area
We serve Dallas and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked: cabinets and countertops in Dallas

Plan on three to four weeks of active work, plus cabinet lead time. Demo and prep take two days, cabinet install and countertop templating take three to four days, the fabrication gap runs five to ten business days, and final set and plumbing take another two to three days. Call (844) 560-0925 for a timeline tied to your specific selections.
Straight cabinet and countertop swaps usually don’t require one. You do need a permit once plumbing, electrical, or structural work moves, which is common when relocating a sink or adding a circuit. We handle permitting and inspections when they apply.
Yes, and it’s the most cost-effective version of the job. Keeping the sink, range, and wall positions in place avoids permit scope and trade rework, which is often the difference between landing near $14,000 and climbing toward $45,000.
The full project runs $14,000 – $45,000, with cabinet installation at $4,000 – $13,000 and countertop installation at $2,000 – $6,500 as individual line items. Call (844) 560-0925 for an exact quote; estimates are free, and 0% financing for 18 months is available.
The 730-Day Done Right Promise covers workmanship for two years: if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in residential construction, and it’s in writing.
Get a free estimate for cabinets and countertops in Dallas
Call (844) 560-0925 and a live person answers, any hour. We’ll set a time to walk your kitchen, measure the room, and check the floors and walls for the Dallas-specific issues that change scope. You get a written line-item estimate and a design consult, free. If you’re planning a wider project, our kitchen remodeling service covers it, and we work throughout Dallas and the surrounding neighborhoods. No-hassle upfront pricing: the number you see is the number you pay, with $1,000 off projects over $10,000.