A Groundwork company - serving Carrollton, TX
A new rear addition with a vaulted beamed ceiling and tall windows
ADU Design & Permitting · Highland Park, TX

ADU Design & Permitting in Highland Park - Design, Permits and Build Under One Contract

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Carrollton
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
A remodeled primary bathroom with a soaking tub and walk-in shower
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

What ADU Design & Permitting in Highland Park actually involves

ADU Design & Permitting in Highland Park means taking a detached unit from a surveyed lot to a stamped, approved plan set before anyone breaks ground, and it runs $45,000 – $130,000 for the design-through-permit scope depending on unit size and how much of the site has to be reworked. Most Highland Park projects take 5 to 9 months from first survey to permit issuance, and the town’s own review is the longest clock in that timeline. Call (844) 560-0925 to start with a free on-site estimate, and we’ll tell you straight what your lot can carry.

Two construction workers installing siding on a home addition project in Highland Park, TX

Call (844) 560-0925

How we take an ADU from survey to issued permit

A single-story rear room addition with tall windows and a new patio

This isn’t a job you can start with a drawing and hope the town agrees. Here’s the actual sequence, stage by stage, with what you decide at each point.

Stage 1: Site survey and coverage math (weeks 1 – 3)

We begin with a current boundary and topographical survey. Your lot coverage, impervious cover, setbacks, and tree locations get measured against the Town of Highland Park’s rules, not Dallas codes. You decide here whether to chase a larger unit or protect a mature tree, because on a tight lot you usually can’t have both.

Stage 2: Schematic design and feasibility set (weeks 3 – 7)

We produce a schematic plan, elevations, and a site plan showing how the unit sits on the lot. This is where the architecture gets matched to the main house so review doesn’t send it back. You choose footprint, height, roof form, and exterior materials at this stage, and those choices lock the permit scope.

Stage 3: Full construction documents (weeks 7 – 12)

Once the schematic is approved by you, we build the full drawing set: structural, foundation, MEP, energy compliance, and detailing. On Highland Park’s century-old lots, this phase often includes a foundation assessment of the main house if the unit will share a utility trench. You approve material specifications before engineering is finalized.

Stage 4: Submittal and plan review (weeks 12 – 24)

We submit to the Town of Highland Park and respond to reviewer comments in rounds. Each comment cycle runs 2 to 4 weeks. You’ll see every reviewer note and approve any scope change before we resubmit, so nothing gets added to the job without your sign-off.

Stage 5: Permit issuance and construction handoff (weeks 24 – 36)

Once the permit is issued, we walk you through the construction scope, schedule, and inspection milestones. You approve the build contract, and the design and permit package becomes the blueprint the crew works from. If you’re expanding the main house at the same time, this is where the ADU design ties into your Home Additions & ADU in Highland Park plan so the two scopes don’t fight each other.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

The real choices behind an ADU design and permit package

Most of the money in this job is decided on paper, before a nail is driven. Here’s what you’ll actually be choosing between.

  • Detached vs. attached footprint: A detached unit buys privacy but eats lot coverage and often runs the high end of the range. An attached design shares a wall and utilities and usually lands closer to the low end, but it can complicate setback review.
  • Panelized or modular shell: Factory-built shell systems from makers like Dvele and Cover can shorten the on-site construction window and improve energy performance, at a higher design and procurement cost up front. Site-built framing runs cheaper but takes longer and is more sensitive to Highland Park’s tight staging.
  • Foundation type: Slab-on-grade is the most cost-effective on stable ground. On Highland Park’s expansive clay, a pier-and-beam or engineered slab is often the smarter long-term call because it handles the wet-dry movement better.
  • Exterior cladding: Brick and stucco hold up to North Texas hail and heat and match the neighborhood’s 1910s – 1930s homes. Fiber cement is a middle path. Wood siding looks right on Tudor styles but needs repainting cycles that add to the lifetime cost.
  • Roof form: A gable matching the main house reads as intentional on Highland Park streets. A low-slope roof saves on framing but can trigger design review pushback, which costs review time in the schedule.
  • Utility strategy: The cheapest path shares the main house’s water and electrical. A fully independent utility service costs more but simplifies metering and is sometimes required if the unit will be rented separately.

What ADU Design & Permitting costs in Highland Park, TX

ADU Design & Permitting in Highland Park runs $45,000 – $130,000 for the design and permitting scope, with the full build on top of that. Here’s what moves that number:

Two construction workers framing a wall for a home addition project in Highland Park, TX
Cost factor Effect on price
Site survey and tree/coverage analysis $2,500 – $6,000
Architectural and structural drawings $12,000 – $40,000
Engineering and energy compliance $4,000 – $14,000
Plan review and resubmittal cycles $3,000 – $12,000
Utility and site coordination $6,000 – $22,000
Design revision mid-review Adds 15 – 30% to design scope

What drives a job to the high end: an irregular lot that needs re-survey mid-project, a protected tree that forces a redesign, a panelized shell that needs a custom engineering package, and a shared utility trench with the main house. What pulls it toward the low end: a clean rectangular lot, a straightforward attached footprint, and a plan set that clears review in one cycle. A written estimate covers the survey, drawings, engineering, and submittal. It typically does not include the actual construction cost, town permit fees, or the engineering assessment on the main house if one is required.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What Highland Park homes specifically do to this job

Highland Park is an enclave entirely surrounded by Dallas that runs its own plan review, zoning, and inspections, and that changes the job before the first drawing. The town enforces its own lot-coverage, impervious-cover, setback, height, and floor-area-ratio limits, and it has its own architectural review expectations, so a design that would sail through Dallas may not clear Highland Park. Nearly every lot here is already built out, which means nearly every ADU is squeezed into a tight infill space alongside a 1910s – 1930s Tudor, Colonial, or Mediterranean on or near streets like Beverly and Armstrong, where alley access leaves almost no room to stage materials and we have to sequence deliveries like a restaurant kitchen. The tree-preservation rules cause real rework: a live oak can force a re-survey and a re-plan mid-project, and we budget review time for that rather than pretend it won’t happen. Add the clay soil shifting under century-old pier-and-beam foundations and the spring storm season that reshapes exterior schedules, and you get the reason Highland Park ADU work costs more than a Dallas ADU on open ground. If you’re also touching the driveway for the new unit’s access, homeowners often pair this with Paver Driveways in Highland Park so the new access matches the lot’s design review.

Serving Highland Park, TX – Our Local Coverage Area

We serve Highland Park and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently asked about ADU Design & Permitting in Highland Park

A framer checking new wall framing on a home addition

Get your Highland Park ADU design and permit estimate

Start with a free on-site estimate. We’ll survey the lot, check your coverage and setbacks against the Town of Highland Park’s rules, and give you a written plan with a real number. Then you’ll know what your lot can actually carry before you spend a dollar on drawings. Call (844) 560-0925 for your free estimate, and we’ll take it from there. Our technicians bring up to 12 years of experience, and the Home Additions & ADU team covers Highland Park, University Park, and the surrounding Dallas neighborhoods. For a fenced ADU yard, pair this with Chain Link Fence in Highland Park.

Written by the team at Groundwork Construction Co.

Why Highland Park Chooses Groundwork Construction Co. of Carrollton

We set the standard for ADU design & permitting in Highland Park.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Highland Park

Getting your ADU design & permitting project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU design & permitting project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU design & permitting pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Highland Park Customers Say

Trusted by homeowners across Highland Park and surrounding areas.

★★★★★

"The schedule he gave me at the start was accurate to within four days on a three month job. Anyone who has done a renovation knows how unusual that is."

Laura Bennett
★★★★★

"Change orders were written down and priced before the work happened, every single time. No surprise at the end."

Keisha Robinson
★★★★★

"He told me one part of what I wanted was a bad idea structurally and offered an alternative instead of just taking the money."

Angela Wong

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new black aluminum pool fence with a gateA new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porchA new bay window with a cushioned seat

More services in Highland Park

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Groundwork in Carrollton

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Carrollton team

A local vetted partner works across Carrollton and the towns around it, to the same written standard as every Groundwork job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for ADU Design & Permitting in Highland Park?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Highland Park.

(844) 560-0925

Request a Free Estimate in Highland Park

Tell us about your ADU design & permitting needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Local Service Coverage
Call Now - 24/7 Dispatch